Running a Performance Validation Test
To run a PV test, proceed as follows:
1. To manually run a PV test, select
Menus
> Run PV Test
to display the
Run PV
Test ?
menu and press the
OK / Enter
Key
to confirm that you want to run the
test.
Where PV testing is being automatically
initiated the
Run PV Test ?
menu is
automatically displayed.
2.
The Operator id option will be displayed.
Press the
OK / Enter Key
to select the
field for editing and then enter your
Operator ID.
3.
The test will advise you of the type and
size of the first test wand to be used,
previously specified in the
PV Test Set
Up
menu.
Note that if no test sample sizes have been programmed then the display will show
+No
and a report will be produced immediately.
4.
You will then be prompted to pass test
sample packs through the detector until
the FE test is complete.
5. Follow the prompts to repeat steps 3 and 4 for the NFE and SS tests until the test is complete.
To cancel a PV test, proceed as follows:
1. To cancel the PV test, just press the
Cancel Key
at any time to return to the
Run PV Test ?
menu.
If the test was initiated manually, no error
is generated.
If the test was initiated automatically, a
non-action error is recorded and a report
is generated.
105
Summary of Contents for IQ3
Page 2: ......
Page 10: ......
Page 26: ......
Page 43: ...Installation 33 ...
Page 60: ...Installation THIS PAGE IS INTENTIONALLY LEFT BLANK 50 ...
Page 70: ...About the Metal Detector Range THIS PAGE IS INTENTIONALLY LEFT BLANK 60 ...
Page 74: ...Getting Started IQ3 Dual Line Display Menu Map 64 ...
Page 116: ...Operating Instructions THIS PAGE IS INTENTIONALLY LEFT BLANK 106 ...
Page 140: ...Maintenance THIS PAGE IS INTENTIONALLY LEFT BLANK 130 ...