Installation
41
For any sensors that r12V please use pin 2 of J1 for the supply feed.
When using the internal power module to supply power to the sensors, a link wire (GND)
must
be
fitted from
TBA1
pin
5
to connection
7
(COM) of the Power supply module.
If this link wire is not fitted and the internal power supply is being used to supply power to the inputs/
alarms/PEC they will not work as they will not be grounded.
Variable Speed Systems
On systems employing variable speed conveyors, special hardware is required to drive the CTB
(conveyor time base) input on the micro control card. Conveyor systems supplied by Loma will
already have this hardware fitted and commissioned, but when purchasing a detector head only, the
following information should be observed when using a variable speed conveyor.
In order for the reject timing to work correctly, it must be supplied with information about how far the
contaminant has travelled between the head and point of reject. This is achieved via a shaft encoder
which supplies pulses to the CTB input of the micro control board.
The delay information, which is entered in the
Product setup
menu, then counts the CTB pulses out
to time the contaminated product to the reject point. For this reason the delay is measured in
distance, and should be set at the fastest conveyor speed in order for the reject device to actuate in
time.
The dwell, on the other hand, should be set at the slowest belt speed to guarantee accurate rejection
at all speeds. The dwell can be in units of time or distance depending upon the type of reject device.
Installing a Metal Detector System
This chapter provides generic information covering the installation of a Loma Metal Detector System
in a logical sequence. The system includes a detector head fitted to a European conveyor belt.
The following sub-sections provide more information:
■
Warnings
A list of applicable
safety warnings
to be observed when installing the metal detector system is
provided.
■
Receiving and Unpacking
Some basic checks should be carried out on receipt of the system to ensure that it has not been
damaged in transit.
■
Moving the Machine
Depending on the size and weight of the system, either a crane or a fork-lift truck will be
required to lift and move it into the final location. This section provides some guidance for
moving the system safely.
■
Adjusting / Levelling the Conveyor
For systems supplied that incorporate a conveyor the operating height may need to be adjusted
so that it can be integrated into your production line. This section provides some guidance for
levelling the system.
■
Clearance Requirements
From safety and operational viewpoints, it is important that sufficient free space is left around
the system, This section provides some guidance.
■
Connecting the Air Supply
Except where a metal detector head only has been supplied, all Loma inspection systems
require a clean and dry compressed air supply where optional automatic reject devices are
fitted. This section provides some guidance on connecting the air supply.
Summary of Contents for IQ3+
Page 2: ......
Page 36: ...Safety First 26 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 43: ...Installation 33 ...
Page 60: ...Installation 50 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 70: ...About the Metal Detector Range 60 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 218: ...Operating Instructions 208 THIS IS PAGE INTENTIONALLY LEFT BLANK ...
Page 244: ...Maintenance 234 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 248: ...Glossary 238 THIS PAGE IS INTENTIONALLY LEFT BLANK ...