Installation
This chapter provides generic information covering the installation of the Loma IQ
3
Metal Detector in a
logical sequence, both as a head only and as a system with the head fitted to a Loma conveyor.
The following sections provide more information:
■
Installing a Metal Detector Head
Provides guidance for installing a metal detector head only.
■
Installing a Metal Detector System
Provides guidance for installing a metal detector system, consisting of a metal detector head
fitted to a Loma conveyor and including standard and optional equipment.
■
All Loma machines are designed and tested against recognised international standards for
Electromagnetic Compatibility, to operate under factory conditions. This section provides
further information on the impact of RF interference.
Installing a Metal Detector Head
This section provides information covering the installation of a Loma IQ
3
Metal Detector Head in a
logical sequence.
The following sub-sections provide more information:
■
A list of applicable
to be observed when installing the metal detector head is
provided.
■
Some basic checks should be carried out on receipt of the machine to ensure that it has not
been damaged in transit.
■
Depending on the size and weight of the detector head, either a crane or a fork-lift truck will
be required to lift and move it into the final location. This section provides some guidance for
moving the machine safely.
■
Detector Head Mounting Positions
Diagrams are included to provide details for mounting detector heads in different positions.
■
Mounting a Detector Head onto a Conveyor
There are a number of points to consider when fitting a new Loma Metal Detector head to an
existing conveyor of whatever manufacture, or when building a new conveyor to incorporate a
metal detector head. This section provides some guidance.
■
Connecting the Detector Head Electrical Supply
This section provides guidance on connecting an electrical supply to the detector head.
29
Summary of Contents for IQ3
Page 2: ......
Page 10: ......
Page 26: ......
Page 43: ...Installation 33 ...
Page 60: ...Installation THIS PAGE IS INTENTIONALLY LEFT BLANK 50 ...
Page 70: ...About the Metal Detector Range THIS PAGE IS INTENTIONALLY LEFT BLANK 60 ...
Page 74: ...Getting Started IQ3 Dual Line Display Menu Map 64 ...
Page 116: ...Operating Instructions THIS PAGE IS INTENTIONALLY LEFT BLANK 106 ...
Page 140: ...Maintenance THIS PAGE IS INTENTIONALLY LEFT BLANK 130 ...