background image

 

CONTENTS

 

 

 

 

 

 

 

 

 

 

Project 2000  presentation 

Pg.3  

Maintenance 

program 

Pg.5 

Safety information 

Pg.3 

 

Limited international warranty 

Pg.5 

Windlass wiring minimum requirements 

Pg.3 

 

Wiring diagram 

Pg.18 

Installation general requirements 

Pg.3 

 

Pictures 

Pg.19 

Installation procedure 

Pg.3 

 

Exploded drawings 

Pg.20 

Test procedure 

Pg.3 

 

Part list 

Pg.21 

Use of the windlass 

Pg.4 

 

Lofrans sales organization 

Pg.22 

 

 

 

 

 

 

 

 

 

 

 

 

SOMMARIO

 

 

 

 

 

 

 

 

 

 

Presentazione del Project 2000 

Pg.6 

 

Programma di manutenzione 

Pg.8 

Informazioni sulla sicurezza 

Pg.6 

 

Garanzia internazionale limitata 

Pg.8 

Requisiti minimi dell’impianto elettrico 

Pg.6 

 Schema 

elettrico 

Pg.18 

Requisiti generali per l’installazione 

Pg.6  

Immagini 

Pg.19 

Procedura di installazione 

Pg.6 

 

Disegni esplosi 

Pg.20 

Test di funzionamento 

Pg.6 

 

Lista parti 

Pg.21 

Uso del salpa-ancore 

Pg.7 

 

Organizzazione di vendita Lofrans 

Pg.22 

 

 

 

 

 

 

 

 

 

 

 

 

TABLES DE MATIERES

 

 

 

 

 

 

 

 

 

 

Présentation du Project 2000 

Pg.9  

Programme 

d'entretien 

Pg.11 

Consignes de sécurité 

Pg.9 

 

Garantie internationale limitée 

Pg.11 

Conditions requises minimum pour le circuit électrique 

Pg.9 

 

Schéma électrique 

Pg.18 

Conditions requises general pour l’installation 

Pg.9 

 

Figures 

Pg.19 

Procédure d'installation 

Pg.9 

 

Schéma détaillés 

Pg.20 

Essai de fonctionnement 

Pg.9 

 

Liste des pièces 

Pg.21 

Utilisation du guindeau 

Pg.10 

 

Réseau de vente Lofrans 

Pg.22 

 

 

 

 

 

 

 

 

 

 

 

 

INHALT

 

 

 

 

 

 

 

 

 

 

Präsentation des Project 2000 

Pg.12  

Wartungsplan 

Pg.14 

Sicherheitshinweise Pg.12 

 

Garantiebedingungen Pg.14 

Mindestanforderungen an die Elektroanlage 

Pg.12 

 

Elektr. Anschlußplan 

Pg.18 

Allgemeine Anforderungen für die Installation 

Pg.12 

 

Bilder 

Pg.19 

Installationsverfahren Pg.12 

 

Explosionszeichnung Pg.20 

Funktionstest Pg.12 

 

Ersatzteilliste Pg.21 

Gebrauch der Ankerwinde 

Pg.13  

Vertriebsstruktur 

Pg.22 

 

 

 

 

 

 

 

 

 

 

 

 

INDICE

 

 

 

 

 

 

 

 

 

 

Presentation de Project 2000 

Pg.15 

 

Programa de mantenimiento 

Pg.16 

Información sobre la  securidad 

Pg.15 

 

Garantìa internacional limitada 

Pg.17 

Requisitos minimos de la installaciòn eléctrica 

Pg.15 

 Diagrama 

eléctrico 

Pg.18 

Requisitos generales de la installaciòn 

Pg.15 

 

Figuras 

Pg.19 

Installaciòn 

Pg.15 

 

Esquema de piezas 

Pg.20 

Prueba de funcionamiento 

Pg.15 

 

Listas de la piezas 

Pg.21 

Uso del molinetes 

Pg.16 

 

Distribuidores de Lofrans 

Pg.22 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for PROJECT 2000 USA

Page 1: ...M 038 03 06 Rev 00 PROJECT 2000 USA INSTRUCTION MANUAL MANUALE DI ISTRUZIONI MANUEL D INSTRUCTIONS GEBRAUCHSANWEISUNG MANUAL DE INSTRUCCI NES...

Page 2: ...Pg 11 Conditions requises minimum pour le circuit lectrique Pg 9 Sch ma lectrique Pg 18 Conditions requises general pour l installation Pg 9 Figures Pg 19 Proc dure d installation Pg 9 Sch ma d taill...

Page 3: ...to avoid accidental engagement All the switches must be wired in parallel We strongly recommend to have a minimum of two switches to operate the windlass in case one of them gets damage All Lofrans eq...

Page 4: ...in stopper If using a combination of rope and chain fix the rope to a strong point such as a cleat Engage the brake 5 RAISING THE ANCHOR Disengage the chain stopper Check if the clutch is engaged Dise...

Page 5: ...warranty starts from the date of purchase of the boat 3 This warranty covers original defects in material and workmanship 4 This warranty is limited to the repairment and or the replacement of the or...

Page 6: ......

Page 7: ...19 PICTURES Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 Fig 6 Fig 7 Fig 8 Fig 9 Fig 10 These pictures are intended for guide only...

Page 8: ......

Page 9: ...hd screw M8x25 Kit B 11 395 Seal 50x70x10 Kit A 2 396 Bearing 16010 2 399 Pawl 2 400 Circlip 15 Din 471 Kit D 4 401 Pivot 2 402 Hex hd screw M6x16 Kit B 3 403 Spring 2 404 Hex hd screw M6x25 Kit B 2...

Page 10: ...Malo MALTA INTERNATIONAL MARINE CENTRE Ta Xbiex Palace Testaferrata Street Msida SPAIN LA INDUSTRIAL VELERA MARSAL S A Muntadas 8 y 10 08014 Barcelona IMNASA S A Adva Zaragozza 73 75 17220 Sant Feliu...

Reviews: