Startup
YarnMaster PRISMA
www.loepfe.com
21
NOTE
An easily accessible disconnect device must be built into the permanent wiring.
is responsible for the initial setup of the yarn clearer system.
n
The yarn clearer system is delivered to the customer ready for use.
n
Installation is performed by the winder manufacturer or by authorized service technicians.
n
After installation and setup by the winder manufacturer, training is provided by authorized service
technicians.
4.2
Startup after an upgrade or software update
To ensure safe operation of the yarn clearer system, all upgrades and software updates must be
performed by authorized service technicians.
4.3
Startup after an interruption in operations
After an interruption in operations, e.g. as the result of a power outage, a warm start will be initiated when
the system is switched back on.
n
Note:
All settings and shift data will be retained. The only exception is the latest cut data which could
not be sent to the LZE before the interruption.