20
10.1
ROOM SEALED (TYPE C) FLUE ASSEMBLY
In order to install the Herald boiler with a type C (room sealed) flue system a flue transition kit must first be installed,
this kit is used for both C
13
(horizontal) and C
33
(vertical) flue systems. The information in this paragraph describes
these flue transition kits and there installation.
10.2
INSTALLATION OF FLUE TRANSITION KIT TO HCB46CE-HCB61CE BOILERS
10.2.1
FLUE
TRANSITION
PARTS
HCB46CE
–
HCB61CE
Depending upon the flue kit chosen either a vertical or a horizontal concentric terminal will be
included in the packaging with the transition kit, additional elbows, flue lengths etc. Further
items are available as ancillaries and may be required to complete the flue system. Additional
wall brackets may be required to ensure the flue system is stable.
For a full list of flue components supplied and optional parts to complete the system see the
herald flue guide available at www.lochinvar.ltd.uk
ITEM NUMBER
DESCRIPTION
HCB 46CE
HCB 61CE
1
90
⁰
ELBOW
3 REQUIRED
3 REQUIRED
2
SAMPLING POINT
1 REQUIRED
1 REQUIRED
3
CONCENTRIC ADAPTOR
1 REQUIRED
1 REQUIRED
4
AIR INTAKE TRANSITION
1 REQUIRED
1 REQUIRED
5
80mm X 500mm LENGTH
CUT TO 270mm
CUT TO 270mm
10.2.2
HORIZONTAL
CONCENTRIC
FLUE
TRANSITION
PARTS
HCB46CE
–
HCB61CE
Summary of Contents for HERALD HCB116CE
Page 8: ...8 3 1 2 PRINCIPLE PARTS TO BE USED IN CONJUNCTION WITH TABLE 3 1 1...
Page 31: ...31 Max distance between brackets...
Page 32: ...32...
Page 33: ...33...
Page 37: ...37...
Page 53: ...53 15 8 WIRING DIAGRAM 15 8 1 WIRING DIAGRAM...
Page 54: ...54 15 9 LADDER DIAGRAM 15 9 1 LADDER DIAGRAM...
Page 92: ...92...