16.3
LPG COMMISSIONING AND TESTING
The commissioning procedure on LPG is similar to that when the heater is firing on Natural Gas. As such, the same procedure should be
followed taking in to account the following information:
LPG
PRESSURE
ADJUSTMENT
AND
COMBUSTION
CHECKS
EcoShield™ are supplied with a pre-set gas/air ratio inlet assembly. This must not be tampered with. Any attempt
to adjust the gas valve or venturi will invalidate the warranty.
Combustion figures should be as follows:
Model No.
CO
2
CO
SHW35-245CE
10.5%
0.5%
<100 ppm
SHW46-325CE
10.5%
0.5%
<100 ppm
SHW61-325CE
10.5%
0.5%
<100 ppm
SHW86-410CE
10.5%
0.5%
<100 ppm
SHW116-410CE
10.5%
0.5%
<100 ppm
SHW146-410CE
10.5%
0.5%
<100 ppm
LPG
COMBUSTION
FIGURES
If the combustion figures are not within the range specified, contact Lochinvar Technical support for further guidance.
Summary of Contents for EcoShield SHW116-410CE
Page 2: ...2 ...
Page 9: ...9 EXPLODED VIEW DRAWINGS ...
Page 27: ...27 Max distance between brackets ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 34: ...34 ...
Page 47: ...47 13 9 LADDER DIAGRAM LADDER DIAGRAM ...
Page 71: ...71 NOTES ...
Page 72: ...72 N ...