307
Boom Hoist Circuit
BOOM DRIFTS DOWN
CAUSE
REMEDY
Hold valve not seating properly
Replace hold valve
Hoist cylinder by-passing
See section on “Cylinder Leakage”
BOOM HOIST ONLY - INOPERATIVE OR ERRATIC
CAUSE
REMEDY
Boom will drift down
Repair or replace hold valve
Boom won’t lower
Repair, replace, or backflush hold valve
Boom hoist cylinder binding
Repair or replace
Load is too great
Consult capacity chart, check RCI
Piston packings damaged
Replace packings
Low oil level
Add oil as required
Hose plugged or liner collapsed
Replace hose
Air in cylinder
Bleed cylinder
BOOM DROPS SLIGHTLY AS RAISE CONTROL IS RELEASED
CAUSE
REMEDY
Air in cylinder
Bleed cylinder
Boom hoist hold valve free flow check not
seating properly
Replace hold valve
BOOM HOIST AND TELESCOPE INOPERATIVE OR ERRATIC
CAUSE
REMEDY
Pump disconnect not engaged
Engage pump disconnect
Main relief valve malfunctioning
See section on “Relief Valves”
Low oil level
Add oil as required.
Rotary manifold leaking internally
Reset rotary manifold
Piston pump faulty
See section on “Pumps”
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...