![LOAD KING 80-160 Operator'S Manual Download Page 276](http://html1.mh-extra.com/html/load-king/80-160/80-160_operators-manual_1932350276.webp)
276
80-160
Maintenance
Swing System Maintenance
Swing Bearing Bolting Procedure
MAINTENANCE CHECK
It is very important to perform periodic swing bearing bolt checks. The bolts
MUST BE KEPT TORQUE
TIGHTENED
to a rating as indicated in chart below. After the first day, and again after the initial 40 hours
of machine operation, check and tighten the bolts. If additional torque is required after the first 8 or 40
hours, then recheck each 8 or 40 hours until all bolts are found properly torqued. Thereafter, checks
should be performed quarterly.
MODEL
4:1 TORQUE MULTIPIER
NO TORQUE MULTIPLIER
80-160
DRY: 245 FT. LBS. (332 NM)
DRY: 980 FT. LBS. (1329 NM)
Bolt torques are checked by applying the stated torque while observing to determine if the bolt “breaks
loose”. If it is tightened (turned) by this procedure then it has loosened and all (26) bolts must be retorqued.
Refer to the sequence illustrated below.
RING GEAR BOLTING SEQ UENCE - (shown below).
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...