![background image](http://html1.mh-extra.com/html/liquid-robotics/wave-glider-sv3/wave-glider-sv3_customer-training-manual_1927433014.webp)
Customer Training Guide
Pre-Launch Wave Glider® SV3
08033 Rev A
9
(Option 2)
WGMS
– Hover over battery icon (This will be updated every hour)
Note:
Minimum battery level for launch depends on weather conditions and Payload type +
quantity of Payloads. Weather conditions consist of sea state, current strength/direction, and the
amount of sunlight in the given area. It is recommended that wave gliders launch fully charged.
Auxiliary Power Units (APU’s) can be added to provide additional battery power when
needed. Each APU provides 850Wh to 980Wh depending on version and age of
batteries. Each APU occupies 1 MPU of space, and plugs into an expansion port. A
maximum of one APU can plug into the backside of another APU, allowing a total of 6
APU’s to be added to the system.
Solar Power Indicators: > 0.00:
Auto filled
(Option 1)
OBSP
– Status – AMPS – Host Domain –
Slot 9
#1
–
Slot 10
#1 & #2 Note: Slot 9
#2 will always be reading 0.00 and that’s ok.