Lippert Components Project 2000 12600 Series Owner'S Manual Download Page 7

Rev: 11.21.2014

Page 7

Euro Loft Bed Lift by Project 2000 Owner's Manual

Prior to Installation

All installation operations shall be carried out by skilled and authorized staff.
Remove the product from packaging.

Installation

Mechanical

NOTE: 

Always install the bed lifting system taking into account the system maximum load. THE BED UNIT 

AS A WHOLE - INCLUDING BED LIFTING SYSTEM, MATTRESS, PILLOW, BLANKETS, ETC. - MUST NOT 

WEIGH MORE THAN 60 KG. 

NOTE: 

TAB. A AND TAB. B images are all located on Page 19 of this manual. 

1. 

Place the system under the bed frame, following the layout example shown in TAB. A - Picture A.1, 

taking into account the motor revolution direction indicated by an arrow on the plastic support 

side (TAB. B - Picture B.1). The revolution direction stands for the winding direction of the belts. As a 

consequence, the shafts must have the same rotation direction.

2. 

It is very important that the belts winding in one direction are mounted in a parallel way on both 

shafts; the same applies to the belts winding in the opposite direction (TAB. B - Picture B.2)

3. 

After mounting the bed lifting system under the bed frame, wind the belts around the shafts taking 

care of the motor revolution direction and pre-wind the belts at least twice (TAB. B - Picture B.3)

NOTE: 

The four belts must be pre-wound at least twice around the shafts in the bed lowest position; the 

same applies to all of the four belts.

4. 

Place the four belt-fixing plates (TAB. A - Picture A.2) in a suitable position - i.e. the highest position the 

system will reach - making sure the belts are aligned with the runners and taking care of the minimum 

distance to be kept between the slider and the belt-fixing plate (TAB. A - Picture A.3) and making sure 

that it will bear the system maximum load. 

NOTE: 

The bed lifting system can bear a total maximum weight of 400 kg. 

5. 

Fix the belt-fixing plates with suitable screws (we recommend 4.2x25 screws) in the four slots first, in 

order to adjust and correct any possible installation defect and then fix all of the remaining screws 

(TAB. A - Picture A.2)

6. 

Place the bed frame inside of the vehicle on four temporary supports in order to keep it parallel to the 

vehicle floor. The temporary supports height must be measured based on the lowest position the bed 

will reach.

7. 

Insert the belts into the belt-fixing plates as illustrated in TAB. A - Picture A.2, stretch them and fix the 

four M6 bolts by cross-screwing, insert the covers into the belt-fixing plates.

8. 

Activate the bed lifting system and lift it to the maximum height wished; then make sure the belts are 

perfectly aligned with the belt sliders.

9. 

Place the two stabilizer runners by inserting them bottom-up into the stabilizers mounted on one side 

of the bed (TAB. A - Picture A.4).

NOTE: 

The runners must be mounted on the longest side of the bed and fixed on a suitable supporting 

bracket with suitable screws so that it will tolerate oscillations caused by the bed lifting system. 

10. 

Fix one screw in the middle channel of the runner (we recommend at least 3.8x20 screws) on the 

highest position available under the stabilizer.

Summary of Contents for Project 2000 12600 Series

Page 1: ...Rev 11 21 2014 Page 1 Euro Loft Bed Lift by Project 2000 Owner s Manual Euro Loft Bed Lift by Project 2000 OWNER S MANUAL...

Page 2: ...ures 6 Movement and Transport 6 Prior to Installation 7 Installation 7 Mechanical 7 Electrical 8 Mechanical Encoder 9 Circuit Board Connection 9 Assembling and Harnessing Procedure for the Encoder Uni...

Page 3: ...cribes the system purpose and use based on its project and technical features it provides instructions for transport proper and safe installation mounting adjustment and use It provides information fo...

Page 4: ...t laws and regulations Use in case of primary power defects Use with serious maintenance negligence Use in breach of the maximum capacity values indicated in this manual Use without safety fall protec...

Page 5: ...led way other than described in this manual or in case of non compliance with maintenance and safety rules Product knowledge and compliance with the instructions provided in these documents are prereq...

Page 6: ...f the goods and to make sure the product is perfectly preserved and intact Make sure the system has no evident damage and the delivery is complete and write any possible problem on the shipping docume...

Page 7: ...Picture A 2 in a suitable position i e the highest position the system will reach making sure the belts are aligned with the runners and taking care of the minimum distance to be kept between the slid...

Page 8: ...x6 screws with some soft thread locker 14 Then install the electrical components Fig 7 and program the system as illustrated in the installation and programming manual ONLY AVAILABLE FOR SERVICE CENTE...

Page 9: ...rotates in the direction shown by the arrow printed on the black plastic cover Connect the ORANGE wires to the Down end of stroke of the mechanical encoder and connect the YELLOW wires to the Up end...

Page 10: ...until the desired position is reached Remember to fasten the 14mm bolt How to correctly check the end of stroke connection 1 Control panel by pressing the UP button the bed must go up and it must go d...

Page 11: ...Pin 5 Motor Grey MOT1 DC 0 12 V Pin 4 Motor Brown Not used Pin 3 Not used Not used Pin 2 Not used Not used Pin 1 Not used The motor has a 5 pole connector for a female movable connector represented in...

Page 12: ...Rev 11 21 2014 Page 12 Euro Loft Bed Lift by Project 2000 Owner s Manual Fig 6...

Page 13: ...ructure developed to this purpose and its stroke is limited by two ends On the upper side the stroke is limited by an end of stroke sensor On the lower side the limit is represented by the lowest posi...

Page 14: ...non observance of the rule could modify the lowest stop position The different models have been designed and manufactured keeping in mind all the main standards of safety to reduce and or cancel any e...

Page 15: ...erated neither with any objects nor with hands Before starting the vehicle engine and driving always make sure the bed lifting system is in its highest position and the safety belts are fastened exclu...

Page 16: ...nd sorting the components hand them to authorized companies for disposal Disassembling and demolition operations shall be performed by skilled and authorized staff Bed lifting system components overha...

Page 17: ...0 guarantees the bed lifting system components for 24 months after purchase Defective parts shall not be tampered with and they shall be returned together with the serial number indicated on the plate...

Page 18: ...Rev 11 21 2014 Page 18 Euro Loft Bed Lift by Project 2000 Owner s Manual Tab A Tab B...

Page 19: ...ottom part of the mechanical end of stroke stops Is the system user s manual available Five Yearly Check Date __________ Number of Cycles _________ Yes No General check of the system by an authorized...

Page 20: ...d so that they can be correctly identified despite wear Are there any clearances in the belt roller s and the gear motor coupling Is the gear motor perfectly working in all of its mechanical functions...

Page 21: ...d so that they can be correctly identified despite wear Are there any clearances in the belt roller s and the gear motor coupling Is the gear motor perfectly working in all of its mechanical functions...

Page 22: ...consent from an authorized LCI representative has been provided Any unauthorized use shall void any applicable warranty The information contained in this manual is subject to change without notice an...

Reviews: