Euro Loft Bed Lift by Project 2000 Owner's Manual

The diagram in Fig. 6 summarizes all of the connections between the board and the other items that should be 

established in order for the system to work correctly.
The motor connections (pin 3 and 7 of the 8-pole connector) and power connections (pins 4 and 8 of the 8-pole 

connector) must be carried out exactly as shown in the picture, be sure to use cables with a minimum section of 

11/64".
Follow the instructions provided with the bed lifting system (wiring diagram).
Comply with current CEI regulations during the installation operation.
The Manufacturer provides a set of standard cables for installation with the bed lifting system. After electric 

installation it will be possible to start up and test the system.
The Manufacturer shall be held harmless for any bed lifting system malfunctioning caused by not having perfectly 

functioning electric system connections or to a wrong installation on the vehicle.

Fig. 7

The bed moves vertically in a specific structure developed to this purpose and its stroke is limited by two ends:

• 

On the upper side, the stroke is limited by an end-of-stroke sensor;

• 

On the lower side, the limit is represented by the lowest position set, by means of regulating the end-of-stroke 

located on the mechanical encoder.

The bed can be lifted or lowered through activation in “ON” position of the key switch located on the panel and 

by pressing the arrow-shaped switches on the front panel. When pressing the UP (arrow up) switch the bed will be 

lifted and it will go down when pressing the DOWN switch.
Two green LED-lights are located on the controller panel and they will simultaneously switch on. During movement 

of the bed, only the LED Corresponding to the direction of travel will be turned on.
The bed will be moving until you keep pressing the switch and it will stop when:

• 

The switch is released.

• 

A pre-set stop position is reached.

• 

The bed is being lifted and the end-of-stroke position is reached.

The bed will move by pressing one of the switches again, unless one of the following conditions is detected:

• 

The bed is in the end-of-stroke position and the UP switch is kept pressed.

• 

The bed is in the lower programmed position and the DOWN switch is kept pressed.

Summary of Contents for Project 2000 12600 Series

Page 1: ...Rev 11 21 2014 Page 1 Euro Loft Bed Lift by Project 2000 Owner s Manual Euro Loft Bed Lift by Project 2000 OWNER S MANUAL...

Page 2: ...ures 6 Movement and Transport 6 Prior to Installation 7 Installation 7 Mechanical 7 Electrical 8 Mechanical Encoder 9 Circuit Board Connection 9 Assembling and Harnessing Procedure for the Encoder Uni...

Page 3: ...cribes the system purpose and use based on its project and technical features it provides instructions for transport proper and safe installation mounting adjustment and use It provides information fo...

Page 4: ...t laws and regulations Use in case of primary power defects Use with serious maintenance negligence Use in breach of the maximum capacity values indicated in this manual Use without safety fall protec...

Page 5: ...led way other than described in this manual or in case of non compliance with maintenance and safety rules Product knowledge and compliance with the instructions provided in these documents are prereq...

Page 6: ...f the goods and to make sure the product is perfectly preserved and intact Make sure the system has no evident damage and the delivery is complete and write any possible problem on the shipping docume...

Page 7: ...Picture A 2 in a suitable position i e the highest position the system will reach making sure the belts are aligned with the runners and taking care of the minimum distance to be kept between the slid...

Page 8: ...x6 screws with some soft thread locker 14 Then install the electrical components Fig 7 and program the system as illustrated in the installation and programming manual ONLY AVAILABLE FOR SERVICE CENTE...

Page 9: ...rotates in the direction shown by the arrow printed on the black plastic cover Connect the ORANGE wires to the Down end of stroke of the mechanical encoder and connect the YELLOW wires to the Up end...

Page 10: ...until the desired position is reached Remember to fasten the 14mm bolt How to correctly check the end of stroke connection 1 Control panel by pressing the UP button the bed must go up and it must go d...

Page 11: ...Pin 5 Motor Grey MOT1 DC 0 12 V Pin 4 Motor Brown Not used Pin 3 Not used Not used Pin 2 Not used Not used Pin 1 Not used The motor has a 5 pole connector for a female movable connector represented in...

Page 12: ...Rev 11 21 2014 Page 12 Euro Loft Bed Lift by Project 2000 Owner s Manual Fig 6...

Page 13: ...ructure developed to this purpose and its stroke is limited by two ends On the upper side the stroke is limited by an end of stroke sensor On the lower side the limit is represented by the lowest posi...

Page 14: ...non observance of the rule could modify the lowest stop position The different models have been designed and manufactured keeping in mind all the main standards of safety to reduce and or cancel any e...

Page 15: ...erated neither with any objects nor with hands Before starting the vehicle engine and driving always make sure the bed lifting system is in its highest position and the safety belts are fastened exclu...

Page 16: ...nd sorting the components hand them to authorized companies for disposal Disassembling and demolition operations shall be performed by skilled and authorized staff Bed lifting system components overha...

Page 17: ...0 guarantees the bed lifting system components for 24 months after purchase Defective parts shall not be tampered with and they shall be returned together with the serial number indicated on the plate...

Page 18: ...Rev 11 21 2014 Page 18 Euro Loft Bed Lift by Project 2000 Owner s Manual Tab A Tab B...

Page 19: ...ottom part of the mechanical end of stroke stops Is the system user s manual available Five Yearly Check Date __________ Number of Cycles _________ Yes No General check of the system by an authorized...

Page 20: ...d so that they can be correctly identified despite wear Are there any clearances in the belt roller s and the gear motor coupling Is the gear motor perfectly working in all of its mechanical functions...

Page 21: ...d so that they can be correctly identified despite wear Are there any clearances in the belt roller s and the gear motor coupling Is the gear motor perfectly working in all of its mechanical functions...

Page 22: ...consent from an authorized LCI representative has been provided Any unauthorized use shall void any applicable warranty The information contained in this manual is subject to change without notice an...

Reviews: