21. Preparation of spraying liquid
•
Prepare only the quantity of plant protection agent as required.
•
Fill approximately 75% of the calculated water quantity in the
spray liquid tank.
When filling with water from the drinking water supply, do not
immerse water hose in the spray liquid.
Use surface water if official permission available.
Take actions to prevent contamination.
The spraying liquid tank can also be filled via an optionally avail-
able external suction unit.
•
The spray liquid tank is equipped with a hydraulic mixing unit to
keep the spraying liquid in motion and prevent settling.
Hydraulic mixing unit:
Fig. 28
Shut-off ball valve Fig. 29
•
The mixing unit is switched on and off via the shut-off valve or
via ball valve (manual version) on pressure filter.
•
Fig. 29 shows shut-off ball valve completely opened.
•
For spraying agents that tend to foam, it may be necessary to
close the valve a little bit.