Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
43
Page 43
U n i v e r s a l T A U - I I
®
C r a s h C u s h i o n
T A P E R E D S Y S T E M
STEP 12
Final Inspection
Use the check list below to confirm that all of the
installation steps have been completed.
Inspection
Date
Inspection By:
Item
All front cable anchor plate and backstop anchor
bolts in place and epoxy cured.
Clevis and pin, mounted to the front cable anchor, is
installed with the handle portion of the pin on the
inside of the anchor assembly, firmly tightened
.
(This may be different depending on the type of
foundation, ie, asphalt or PCC.)
All cable guide assemblies securely fastened.
System cables tightened to meet torque
specifications.
Pipe panel mounts positioned properly, flat end
facing back, cut out facing forward.
Sliding panels installed properly to allow for
stacking.
Sliding panels should have no more than a ¾”
(19mm) gap between stacked panels.
Nose cover properly installed with thick spacer and
tightened to specifications.
Torque Sliding Bolt assemblies to specifications.
Do NOT over tighten.
Energy Absorbing Cartridges (EAC) installed in
proper A-B position and sequence. See
Configuration Chart.
EAC air discharge holes positioned properly.
Rotate cast ID to the top of the cartridge.
Asphalt adapter installed on both sides of portable
concrete barrier when applicable.
Torque all fasteners to meet specifications.