background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

MULLION

OUTLET BOX SCREWS

MOUNTING PLATE
CANOPY

1/4-20 BOLTS

CLEAT

GASKET

CLEAT

FIG. 4

FIG. 3

FIG. 2

FIG. 1

 

COMPANY

631 Airport Road, Fall River, MA 02720 

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE

This fixture is intended for installation in accordance with the National Electrical Code and local regulations.  To 

assure full compliance with local codes and regulations, check with your local electrical inspector before 

installation.  To prevent electric shock, turn off electricity at fuse box before proceeding. 

Retain these instructions for maintenance reference.

INSTRUCTION SHEET NO.

IS:C7CW 

Page 1 of 2

A0604 

  CAUTION: 

For wet locations, in accordance with Underwriters Laboratories  

  requirements, a line of caulking compound such as acrylic or silicone must be 
  placed around the perimeter of CANOPY to seal water away from the  
  outlet box and back openings.  Use only compatible REFLECTOR TRIMS 
  rated for use in Wet Locations.   

 

INSTALLATION OF WALL CYLINDER TO OUTLET BOX  
(Fig. 1, 2, 3, & 4)

 

 
STEP 1:

  Attach MOUNTING PLATE to outlet box with OUTLET BOX 

SCREWS. 

 

STEP 2:

  

Pass supply leads through opening in CANOPY and CLEAT. 

 

STEP 3:

 

 Attach CANOPY and CLEAT to MOUNTING PLATE with (2) ¼-20 

BOLTS (provided).

 

 

STEP 4:

  

Make Connections.  Bare Copper and/or green insulation wire(s) 

must be connected to SUPPLY GROUND.  Connect WHITE BALLAST LEAD 
to NEUTRAL (WHITE) SUPPLY LEAD.  Connect BLACK BALLAST LEAD to 
HOT SUPPLY LEAD.  Use wire nuts (local hardware items).  

 

STEP 5:  

Install SET SCREWS loosely.  Push excess supply leads back into 

outlet box.  Place cylinder over CLEAT and tighten (2) SET SCREWS. 

 
 

INSTALLATION OF WALL CYLINDER TO POST OR OTHER 
VERTICAL SURFACE MOUNTING (Fig. 2, 3 & 4) 

 

1

.  

CLEAT can also be mounted directly to any flat surface such as 

MULLION. In this case, use of CANOPY is optional.  Bring supply 
leads through CLEAT and install CLEAT to wall.  For wet locations, in 
accordance with Underwriters Laboratories requirements, a line of 
caulking compound such as acrylic or silicone must be placed around 
the perimeter of EXTRUDED ARM to seal water away from the 
wireway and back openings. 

 

2.  

Proceed with Step 4 and 5 above.  

 
 

INSTALLATION OF REFLECTOR TRIM TO CYLINDER (Fig. 4)

 

Follow installation instructions in Reflector Trim Instruction Sheet. 

 
 

CAUTION:   

 

DO NOT ENERGIZE THE LAMP UNTIL  

 

REFLECTOR TRIM IS COMPLETELY INSTALLED.  

WARNING: 

USE ONLY REFLECTOR TRIMS PROVIDED BY LIGHTOLIER.  USE OF OTHER MANUFACTURERS’ 

REFLECTOR TRIMS MAY VOID THE UNDERWRITERS LABORATORIES LISTING AND COULD CONSTITUTE A FIRE HAZARD.

INSTALLATION PROCEDURE FOR: C7CW SERIES 7” DIA. H.I.D. WALL CYLINDER 

USED WITH C7E17VM, C7E17OVM, C7P38MH, C7E17PL, C7E17FL SERIES FLANGLESS 

REFLECTOR TRIM (ORDER SEPARATELY) 

Reviews: