Light My Bricks : Fire Brigade LED Lighting Kit
Here is the instructions document for the LEGO Fire Brigade LED lighting kit. Please read
and follow the steps carefully to ensure this lighting kit is installed properly.
Package contents:
1x
Lamp Post with 30cm Bit Light installed
4x
White Bit Lights 30cm
4x
White Bit Lights 15cm
2x
White Flashing Bit Lights 15cm
2x
Red Flashing Bit Lights 30cm
5x
LED Strip Lights
4x
15cm Connecting Cables
1x
30cm Connecting Cable
5x
Adhesive Squares
1x
12-port Expansion Board
1x
8-port Expansion Board
1x
AA Battery Pack
(Requires 3x AA Batteries)
1x
Flat Battery Pack
(Requires 2x CR2032 Batteries)
Extra LEGO Pieces
2x
LEGO Trans Red 1×1 round bricks
2x
LEGO Light Grey 1L bar with mechanical claw clip
4x
LEGO Plates 1×6
for mounting Strip Lights
Summary of Contents for Fire Brigade
Page 6: ......
Page 7: ...OK Let s Begin Instructions for installing this kit...
Page 9: ......
Page 12: ......
Page 14: ...Reconnect the red piece we removed at the start...
Page 16: ...2 Turn over again and remove the two grey 1 6 plates...
Page 18: ......
Page 19: ...Repeat this process to feed the other cable up to the back section...
Page 20: ...3 Remove the following sections to give us more room to access the back of the truck...
Page 25: ...Repeat this process to install another White 15cm Bit Light to the other side...
Page 32: ...10 Tuck the expansion board and any excess cables into the back section of the truck...
Page 35: ......
Page 39: ......
Page 40: ......
Page 43: ......
Page 44: ...Reconnect the various tiles and pieces we removed earlier...
Page 51: ......
Page 52: ...Remove one of the door lamp sections and disconnect the lamp pieces as per below...
Page 53: ......
Page 56: ...Reconnect this wall section back to the front wall ensuring the cable is laid behind...
Page 57: ...Repeat this step to install another White 30cm Bit Light to the door lamp on the right side...
Page 58: ...7 Reconnect the surrounding LEGO pieces we removed earlier...
Page 64: ......
Page 68: ...Thread the cable for the light on the left up through spacing of the stair case as per below...
Page 71: ...Wind all 4 cables around the expansion board 4 5 more times...
Page 75: ......
Page 77: ......
Page 78: ......
Page 82: ...17 Take a 30cm Connecting Cable and connect this to the left port of striplight 1...
Page 86: ......
Page 89: ...21 Reconnect this section back to the top of the building ensuring the cables are laid behind...
Page 94: ...25 Take the AA Battery Pack and place it on the roof in the following position...
Page 98: ......