
–14–
2. Indoor unit installation
Installation of Unit
Install the unit above the ceiling correctly.
•
Apply a joint-canvas between the unit and duct to
absorb unnecessary vibration.
• Apply a filter Accesso
ry at air return hole.
•
Install the unit leaning to a drainage hole side as
shown in figure for easy water drainage.
•
A place where the unit will be leveled and that can
support the weight of the unit.
•
A place where the unit can withstand its vibration.
•
A place where service can be easily performed.
CASE 1
POSITION OF SUSPENSION BOLT
CASE 2
POSITION OF CONSOLE BOLT
(Unit:mm)
Drainage hole
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4 (Local
supply)
X 4
M10 Nut
M10 SP. washer
M10 washer
X 4
X 4 (Local
supply)
X 4
A
B
C
1-3 mm
D
(G)
H
I
E
F
NOTE:
• Th
roughly study the following installation locations:
1. In places such as restaurant and kitchen, considerable amount of oil steam and flour adhere to the fan, the fins of the heat
exchanger, resulting in heat exchange reduction, spraying, dispersing of water drops, etc.
In such cases, take the following actions:
• Make sure that the ventilation fan
for smoke-collecting hood on a cooking table has sufficient capacity so that it draws oily
steam which should not flow into the suction of the air conditioner.
• Make enough distance f
rom a cooking room to install the air conditioner in such a place where it may not suck in oil steam.
2. Avoid installing air conditioner in such circumstances where cutting oil mist or iron powder is in suspension in factories,etc.
3. Avoid places where inflammable gas is generated, flows in, is stored or vented.
4. Avoid places where sulfurous acid gas or corrosive gas is generated.
5. Avoid places near high frequency generators.
Summary of Contents for TB-H488RSS5
Page 1: ...Ceiling Duct Type Air Conditioner SERVICE MANUAL MODELS TB H488RSS5 ...
Page 5: ...1 Specifications 1 1 Indoor unit 5 5 5 ...
Page 7: ...5 ...
Page 8: ...8 5 ...
Page 19: ... 19 Preparation of Piping 6 Connecting Pipes to the Indoor Unit ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 39: ... 39 Electronic control device MAIN P C B ASM ...
Page 42: ......