3-1
INSTALLATION
PRECAUTIONS ON INSTALLATION
A. Plug the power supply cord into a 120V AC, 60Hz,
single-phase power source with a capacity of 15A
or 20A.
B. Avoid placing the unit in a location where there is
direct heat or splashing water.
C. Install the unit on the mounting plate firmly.
D. Place the unit as far away as possible from TV,
radio, etc. to prevent interference.
GROUNDING INSTRUCTIONS
For personal safety, this appliance must be fully
grounded at all times.
In the event of an electrical short circuit, grounding
reduces the risk of electrical shock.
The plug must be plugged into an outlet that is
properly installed and grounded.
BEFORE YOU BEGIN, READ THE FOLLOWING INSTRUCTIONS COMPLETELY AND CAREFULLY.
WARNING
Improper use of the grounding plug can result in a
risk of electric shock.
Do not, under any circumstances, cut or remove the
third ground prong from the power cord plug.
CAUTION
This unit is equipped with a 3-prong plug for your
safety. If the wall outlet is a grounded 3-hole type,
the unit will be grounded automatically.
Plug with Ground
Prong
Properly Polarized
and Grounded
Outlet
Summary of Contents for LMV1925SB
Page 9: ...5 1 SCHEMATIC DIAGRAM OVERALL CIRCUIT DIAGRAM ...
Page 10: ...5 2 MATRIX CIRCUIT FOR TOUCH KEY BOARD CUSTOM SET CUSTOM COOK Q DEFROST Ez On ...
Page 38: ...8 2 CONTROL PANEL 24781M 24810P 23572A 07 268711 WTP013 WTT029 23506A EV ...
Page 40: ...8 4 LATCH BOARD 466001 43501A 43500A 466003 466001 44510A WSZ084 EV ...
Page 44: ...8 14 SCHEMATIC DIAGRAM OF P C B ...
Page 45: ...8 15 PRINTED CIRCUIT BOARD ...