
Procedure
a) Initialize phone by clicking Initialize button.
b) Set the BCH and TCH of the phone 62 for E-GSM900 and 699 for DCS1800. Of cause you have to
match test equipment’s BCH and TCH ARFCN with this value. For each power level, adjust the DAC
value to get target power and click Test button. Then you can see the output power displayed on test
equipment.
c) Saving updated calibration data into phone by clicking Calib Saving button.
7.2.5 Test JIG Operation
JIG Power
Equipment
Description
Power Supply
Usually 4.0V
DC Adaptor
9.5V, 500mA
JIG DIP Switch
Switch Number
Name
Description
Switch 1
ADI_REMOTE
In On state phone is awaked. Not used - OFF state
Switch 2
TI_REMOTE
In On state phone is awaked.
Switch 3
VBAT
Power is provided for phone from Power supply
Switch 4
PS
Power is provided for phone from DC adaptor
JIG LED
LED Number
Name
Description
LED 1
POWER
Power is provided for test JIG
LED 2
TA
Indicate charging state of the phone battery with travel charger
LED 3
MON STATUS
Indicate date transfer state through the UART IrDA
LED 4
UART STATUS
Indicate date transfer state through the UART MODEM
Operation
1) Connect the RS232 serial cable between COM port of notebook and MON port of test JIG in general
2) Set the power supply 4.0V
3) set the 3rd of DIP SW ON state.
4) set the 4th of DIP SW ON state.
DIP SW
ON
OFF
1
2
3 4
5) Press the phone power key. If the remote power on is used, switch the 1st of DIP SWITCH ON.
-117-
Summary of Contents for L1100
Page 1: ...Service Manual Model L1100 Service Manual L1100 P N MMBD0032801 Date June 2004 Issue 1 0 ...
Page 31: ... 30 Figure 14 Power Supply Scheme ...
Page 46: ... 45 Figure 25 CLC344E Camera Chip Circuit ...
Page 49: ... 48 Figure 28 Camera Module Circuit MAIN BOARD FPCB ...
Page 62: ...4 9 Microphone Trouble 61 Circuit Diagram ...
Page 82: ... 81 U602 FPCB CN2 1 3 U601 5 4 Test Points 1 20 2 19 ...
Page 98: ...5 1 Disassembly 5 ASSEMBLY INSTRUCTION 97 2 1 1 2 ...
Page 99: ...98 1 2 3 2 1 ...
Page 100: ... 99 1 2 3 ...
Page 101: ... 100 ...
Page 103: ...6 2 Download Procedure 1 Execute Fluid_GUI exe and select Erase Program flash menu 104 ...
Page 104: ...2 Click the Add button Then choose m0 file which is going to download 105 ...
Page 108: ...6 Wait for downloading to be finished 109 ...
Page 125: ... 127 9 PCB LAYOUT ...
Page 126: ... 128 9 PCB LAYOUT ...
Page 129: ... 131 12 EXPLODED VIEW REPLACEMENT PART LIST 12 1 EXPLODED VIEW ...