C
HAPTER
3
| Installing the Switch
Mounting
– 51 –
ES-4550G / ES-4526G
D
ESKTOP
OR
S
HELF
M
OUNTING
1.
Attach the four adhesive feet to the bottom of the first switch.
Figure 19: Attaching the Brackets
2.
Set the device on a flat surface near an AC power source, making sure there
are at least two inches of space on all sides for proper air flow.
3.
If installing a single switch only, go to
"Connecting to a Power Source" on
, at the end of this chapter.
4.
If installing multiple switches, attach four adhesive feet to each one. Place
each device squarely on top of the one below, in any order.
Summary of Contents for iPECS ES-4526G
Page 1: ...Installation Manual ES 4550G ES 4526G Managed Layer 3 Stackable GE Switch ...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14 ES 4550G ES 4526G ...
Page 20: ...TABLES 20 ES 4550G ES 4526G ...
Page 22: ...FIGURES 22 ES 4550G ES 4526G Figure 30 Crossover Wiring 77 ...
Page 36: ...CHAPTER 1 Introduction Features and Benifits 36 ES 4550G ES 4526G ...
Page 44: ...CHAPTER 2 Network Planning Application Notes 44 ES 4550G ES 4526G ...
Page 88: ...APPENDIX C Specifications 10GBASE Extender Module SFP 88 ES 4550G ES 4526G ...
Page 97: ......