50
3.
The next Installation Wizard test determines whether
all cover panels are correctly installed and fully seated.
Check the lower right corner of the screen for any
error messages. If panel errors appear, match the
panel letters to this illustration
.
a.
Front bottom panel
b.
Middle vent panel
c.
Front top panel
d.
LED display
e.
Area light bar
f.
Rear bottom panel
g.
Rear middle panel
h.
Rear top panel
i.
Left extrusion
j.
Right extrusion
If any panel needs re-installation, review the procedures above to double-check that all panels are
fully seated and that the edges of all signs are captured fully by the panels around them.
4.
Select the option “New installation”.
5.
Confirm you have all required materials to continue activation, and select Yes.
6.
Skip the next section and continue with
Pinpoint the Station(s) (page 52)
.
Complete the Installation Wizard: Paired Installations
Follow the steps in this section if you are installing Paired charging stations. For Standalone
installations, see the previous section.
Once all pairing cables are installed and all cover panels are in place, the on-screen Installation
Wizard steps you through a series of tasks to set up the Express 250 and verify that it can operate
DANGER:
RISK OF SHOCK. If a fault exists, turn the power off during work and keep it off
until all panels are reinstalled. FAILURE TO FOLLOW THESE INSTRUCTIONS CAN RESULT
IN SERIOUS INJURY OR LOSS OF LIFE.
CAUTION:
Do not use either Paired station for a charging session, from the time work is
begun to the point that both stations are confirmed as having Paired functionality.
Equipment damage can result from plugging in a vehicle while the update is only partially
complete.