
Pair the Charging Stations
25
B lugs on the top B1 terminal blocks. Fasten each lug in this order: terminal block, lug, M6 flat
washer, M6 Belleville washer with the cup facing the station, 10 mm M6 nut.
f.
Use a 10 mm (3/8 in) nut driver to torque DC lugs to 5.5 Nm (48.7 in-lbs). Mark all DC
connections with a paint pen.
10.
Complete the above steps for Station 2.
Install the Ethernet Wiring
1.
Measure the length needed to extend the
Ethernet wiring from the conduit opening, up
the side of the frame, and into the Express 250’s
Station Management Unit, located on a rail
under the touchscreen (approximately 317.5 cm/
125 in). Trim the excess wire.
2.
Route the Ethernet wire up the rear side of the
frame, through the plastic P-clips (a), and into
the top wiring hole (b).
CAUTION:
Do not under- OR over-torque the DC fasteners. Excess torque, even with hand
tools, can damage the terminal blocks.
250_IGcombo.pdf 31
11/18/2019 3:37:41 PM