Secure Anchors and AC Wiring
This section describes how to receive and anchor a new Express 250 charging station, and wire the
AC conductors. These steps are the same for both Standalone and Paired installations.
Prepare the Express 250 for Mounting
Note:
The Express 250 is equipped with both forklift handles and crane lift guides to move and
mount the Express 250. Lifting straps, supplied with the crate, can be used for either configuration.
1.
Ensure all four AC and DC conduit stub-ups (if applicable) are trimmed to a height within reach
of the adjustable rodent guard brackets: a minimum of 60 mm (2.4 in) from the ground,
maximum 160 mm (6.3 in). If the site is using armored cable, strip the outer jacket to within the
same height.
2.
Ensure no bell ends are left on any conduit after all wires are pulled. Bell ends can interfere with
station placement.
Important:
Only the four corner anchor bolts are required for station stability. Newer
charging stations are designed to only use the four corner anchor bolts. If the site is
already designed with six anchor bolts, removing the middle bolts is not required. Always
use the leveling nuts on three corner bolts to level the system, then complete torquing
instructions for all four corner nuts as described in a later section.
Important:
If you are replacing an Express 200, skip Step 1. The Express 200 adapter must
be removed as described in
Removing the Express 200 Adapter (page 55)
prior to Step 2.