background image

 

  

 

 

IGP-0871 

8-Port L3 Lite Managed Gigabit PoE 

Industrial Switch

 
 

Quick Installation and 

Initial Configuration 

 
 
 
 
 
 

 

 
 
 
 
 

 

Summary of Contents for IGP-0871

Page 1: ...i IGP 0871 8 Port L3 Lite Managed Gigabit PoE Industrial Switch Quick Installation and Initial Configuration...

Page 2: ...g the Switch 6 Package Contents 6 Mounting the Switch on a DIN Rail 6 Mounting the Switch on Wall Optional 7 Connecting the DC Power Cord 8 Connecting the DI DO Relay Wires 9 Installing SFP Modules 10...

Page 3: ...al Switch By reading this user guide users can perform the following tasks To check the switch status by reading the LED behavior To reset the switch or to restore the switch to factory defaults To in...

Page 4: ...tatus checking and monitoring There are three types of LEDs as follows Power LEDs indicates if the switch is powered up correctly or not System LED indicates if the system is ready or not Alarm LED in...

Page 5: ...not receiving power from power2 Table 2 System LED LED Color State Description System Green On The switch is ready Off The switch is not ready Table 3 Alarm LED LED Color State Description Alarm Red...

Page 6: ...has no active network cable connected or it is not established a link to connected device Otherwise the port may have been disabled through the switch user interface RJ45 Ports Down Green On The port...

Page 7: ...the switch back to the previous configuration settings saved Restore the Switch to Factory Defaults to restore the original factory default settings back to the switch Note According to the table belo...

Page 8: ...N Rail Step 1 Attach the DIN Rail mounting kit to rear panel of the chassis Insert screws and tighten then with a screwdriver to secure the kit Figure 3 Attaching DIN Rail Kit to the Switch Step 2 Ins...

Page 9: ...the switch is attached securely to DIN Rail Figure 5 The switch is attached to DIN Rail Mounting the Switch on Wall Optional Step 1 Attach the wall mounting plates to rear panel of the chassis Insert...

Page 10: ...ion of Wall Mounting Plates Step 2 Install user supplied screws on the appropriate location on the wall Step 3 Make sure that the switch is attached securely to wall Connecting the DC Power Cord Step...

Page 11: ...screws on the front of the terminal block connector Step 3 Insert the terminal block connector prongs into the terminal block receptor Step 4 Check the SYS LED If it is ON the power connection is cor...

Page 12: ...A Digital input level 0 Low 0V to 6V level 1 High 10V to 24V FAULT The two contacts of the terminal block connector are used to detect user configured events The two wires attached to the fault contac...

Page 13: ...11 Figure 10 Installing a SFP Module into a SFP Port Note The SFP ports should use UL Listed Optional Transceiver product Rated 3 3Vdc Laser Class 1...

Page 14: ...the switch s default IP address as shown below The initial switch configuration procedure is as follows Note The factory default IP address of the switch is 192 168 1 1 The factory default Subnet Mas...

Page 15: ...e radio button Use the following IP address and enter in the IP for the PC e g any IP address not in use and in between 192 168 1 2 and 192 168 1 254 Subnet mask e g 255 255 255 0 and Default gateway...

Page 16: ...m the following steps Refresh the web page Check to see if there is an IP conflict issue Clean browser cookies and temporary internet files Check your PC settings again and repeat step 2 6 Enter the f...

Page 17: ...on is not working 1 Check if the cable connector plug is firmly inserted and locked into the port at both the switch and the connected device 2 Make sure the connected device is up and running correct...

Reviews: