3-6
Installing the Switch
3
Installing an Optional SFP Transceiver
Figure 3-6 Inserting an SFP Transceiver into a Slot
The switch supports 1000BASE-SX and 1000BASE-LX, and 1000BASE-LH
SFP-compatible transceivers. To install an SFP transceiver, do the following:
1.
Consider network and cabling requirements to select an appropriate SFP
transceiver type.
2.
Insert the transceiver with the optical connector facing outward and the slot
connector facing down. Note that SFP transceivers are keyed so they can only
be installed in one orientation.
3.
Slide the SFP transceiver into the slot until it clicks into place.
Note:
SFP transceivers are hot-swappable. The switch does not need to be powered off
before installing or removing a transceiver. However, always first disconnect the
network cable before removing a transceiver.
Note:
SFP transceivers are not provided in the switch package.
Summary of Contents for GTL-2690
Page 2: ......
Page 4: ......
Page 18: ...xiv Figures ...
Page 26: ...Introduction 1 8 1 ...
Page 34: ...2 8 Network Planning 2 ...
Page 44: ...3 10 Installing the Switch 3 ...
Page 56: ...A 4 Troubleshooting A ...
Page 62: ...B 6 Cables B ...
Page 73: ...Index Index 3 V VLANs routing 2 6 tagging 2 5 W web based management 1 2 ...
Page 74: ...Index Index 4 ...
Page 75: ......