
C
HAPTER
3
| Installing the Switch
Mounting
– 38 –
M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
R
ACK
M
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
◆
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range. (See
◆
Mechanical Loading: Do not place any equipment on top of a rack-mounted
unit.
◆
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
◆
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Summary of Contents for GEL-2870
Page 1: ...LevelOne GEL 2870 24 GE 4 GE Combo SFP L2 SNMP Switch Installation Guide version 1 0...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 20: ...TABLES 20...
Page 22: ...FIGURES 22...
Page 28: ...CHAPTER 1 Introduction Description of Hardware 28...
Page 70: ...GLOSSARY 70...
Page 73: ......