
Starting up the device - Basic configuration
Leuze electronic
CML 730-PS
60
The structure of the configuration in the receiver control panel menu is as follows:
Select Main Settings > Command > Teach.
Press the
button to execute the teach.
The display shows
If the teach was started while in process mode, the display returns to the process mode display after a
successful teach (see chapter 8.1).
If the teach was started from alignment mode, the display returns to the bar graph indicator following a
successful teach and shows the received signal level of the first beam (FB) and the last beam (LB) (see
chapter 8.1).
If teach is successful, both bars display the maximum value.
Figure 8.4: Display after successful teach
If no bars are visible in the bar graph indicator for the first beam (FB) and the last beam (LB), an error has
occurred. It is possible, e.g., that the reception signal is too low. You can correct errors according to the
error list (see chapter 13).
Power-Up Teach
After applying operating voltage, the “Power-Up Teach”"
The structure of the configuration in the receiver control panel menu is as follows:
Select Main Settings > Operation Settings > Power-Up Teach > Active.
Level 0
Level 1
Level 2
Description
Main Settings
Commands
Teach
Reset
Factory Settings
Wait...
Level 0
Level 1
Level 2
Description
Main Settings
Commands
Teach
Reset
Factory Settings
Operation Settings
Filter Depth
Beam Mode
Function Reserve
Blanking Teach
Power-Up Teach
Inactive
Active