www.lesscare.com
5
VANITY SET:
LV2
VANITY C VANITY TOP + MIRROR
INSTALLATION STEPS
All LV2 vanity cabinets by LessCare® come
pre-assembled. All door and drawer handles
are installed from the inner side of the drawer
to avoid damage during transportation. Open
the drawers to install the handles. Unscrew
every handle and install them from the outer
side of the doors and drawers.
See Figure 1
Note:
It is highly recommended not to use
electric drill to avoid overtightening the screws
during handle installation.
INSTALL DOOR & DRAWER HANDLES
See Figure 1
Prior to installation of the phoenix stone
vanity top you must apply a silicone layer by a
perimeter of the vanity base cabinet and
carefully lay down the vanity top on top of the
vanity cabinet.
See Figure 2
Note (single vanity sink cabinet installation):
Vanity top is slightly wider than the actual
cabinet. Make sure that outstanding edges are
equal at left and right sides.
Apply a silicone layer on the back side of the
vanity top that will be adjacent to the wall.
Lay down the sink on the vanity top and align
thier drain holes. Use a pencil to draw a line by
a perimeter of the sink.
Apply a silicone layer on the bottom of the sink
prior to installtion on top of the vanity top.
Carefully lay down the vessel sink ot top of the
vanity top. Once the sink is on top apply a light
pressure to fixate the sink on the top.
Note:
You may use a pencil or marker to draw
slightly visible marks of the sink's edges on top
of the vanity top.
See Figure 3
Allow the silicone dry for 48 hours prior to the
first use of the vanity cabinet.
VANITY CABINET ASSEMBLY
See Figure 2
See Figure 3