Lesite
Providing best plastic welding tools
Fuzhou Lesite Plastics Welding Technology Co.,Ltd
Website
:
www.lesiteweld.com
Email: [email protected]
Mob: 86-18650793446
Add:16th building, Juyuanzhou Park,
Jinshan Industry Area, No.618 Jinshan Road
Cangshan Area,
Fuzhou, Fujian, China
Tel:
:
86-591- 83818890
Fax
:
86-591-88211499
Weld back the removed wires and reassemble on the opposite sequence (Note: keep upper and lower
pressure roller is parallel during assembling.).
4) Replacing of upper and lower pressure roller
Remove the chain guard, take off the forcing off screws on the two chain wheels and then remove
chain wheel and chain. For upper rubber wheel, it can be removed if the two screws on bearing housing
that on both sides of press plate are removed. For lower rubber wheel, it can be removed if the bearing
on one side of chain wheel. Reassemble them in the same method.
7. Control schematic diagram and motor wiring diagram (Fig.9 &