8400 BaseLine D | Software Manual
Commissioning
Test commissioning
28
L
Firmware 03.00 - DMS EN 5.0 - 07/2009
3.3.1
Test commissioning with keypad control
Commissioning steps
1. Wire the power connections
Make use of the Mounting Instructions supplied with the frequency inverter to
wire the power terminals according to the requirements of your device.
2. Wire the control connections
3. If you are sure that the state of the frequency inverter is as delivered from the
manufacturer (Lenze setting), you can skip this commissioning step.
If not, restore the Lenze setting on the frequency inverter:
[3-2]
Setting / resetting the Lenze setting
Digital inputs at terminal X4
Assignment
Info
RFR
• Controller enable
RFR = high
• Error reset
High
→
low (edge-controlled)
• Select menu -1- (all parameters)
• Press "Enter" key
• Set code
• Press "Enter" key
• Set subcode C001
• Press "Enter" key
• Set value "01"
• Press "Enter" key
DI1
DI2
DI3
RFR
X4
24E
DO1
12I
AR A1U GND
DI4
-0-
_
`
PASS
5 sec.
0000
_ `
....
....
_ `
....
`
....
....
`
_
_
_ `
....
C002
c001
01
-1-
8888
Status
Password
Menu
Code
Subcode
Action