Commissioning
Before switching on
7
EDK94AYCET DE/EN/FR/ES/IT 5.1
43
H1inbet−LESE_INB_KHB E94AYCET
7
Commissioning
Before switching on
Stop!
Before switching on the standard device with the communication module for
the first time, check the entire wiring for completeness, short circuit and earth
fault.
E94AYCET (EtherCAT) communication manual
Here you’ll find some detailed information on commissioning the
communication module.