1
Air baffle pinch tab
2
Air baffle
2. Lower the air baffle into the server until the air baffle is seated firmly.
3. Press the power supply release tab and rotate the power supply back into the server.
1
Power supply support bracket
2
Power supply release tab
4. Install the side cover (see “Installing the side cover” on page 252).
5. Lock the side cover.
6. Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server.
Installing the side cover
If you removed the side cover, reinstall it.
Attention:
For proper cooling and airflow, replace the side cover before turning on the server. Operating
the server for extended periods of time (more than 30 minutes) with the side cover removed might damage
server components.
To install the side cover, complete the following steps.
252
ThinkServer TD200 Hardware Maintenance Manual
Summary of Contents for ThinkServer TD200
Page 2: ......
Page 8: ...viii ThinkServer TD200 Hardware Maintenance Manual ...
Page 28: ...20 ThinkServer TD200 Hardware Maintenance Manual ...
Page 138: ...130 ThinkServer TD200 Hardware Maintenance Manual ...
Page 264: ...256 ThinkServer TD200 Hardware Maintenance Manual ...
Page 300: ...292 ThinkServer TD200 Hardware Maintenance Manual ...
Page 327: ...Lenovo product service Appendix A Getting help and technical assistance 319 ...
Page 328: ...320 ThinkServer TD200 Hardware Maintenance Manual ...
Page 338: ...330 ThinkServer TD200 Hardware Maintenance Manual ...
Page 344: ...336 ThinkServer TD200 Hardware Maintenance Manual ...
Page 345: ......
Page 346: ...Part Number Printed in USA 1P P N ...