5. Touch the static-protective package that contains the new DVD drive to any unpainted metal surface on
the server; then, remove the DVD drive from the package and place it on a static-protective surface.
6. Follow the instructions that come with the drive to set jumpers or switches, if there are any.
Note:
You might find it easier to install the new drive from the front and then attach the cables.
7. Align the holes on the blue optical drive rails with the pins on the side of the drive and snap the optical
drive rails onto the drive. Align the rails on the DVD drive with the guides on the drive bay and slide the
drive into the drive bay until it locks into place.
00
00
00
00
00
00
00
00
00
00
0000
0000
0000
0000
0000
0000
00000
00000
00000
00000
00000
00000
000
000
000
000
0000
0000
0000
1
EMC shield
2
Optical drive
3
Optical drive rails
8. Reconnect the power and signal cables to the drive.
9. Make sure that the signal cable is routed through the plastic slot on the bottom of the chassis underneath
the fan cage assembly so that it does not block the airflow to the rear of the drives as shown in the
following illustration:
168
ThinkServer TD200 Hardware Maintenance Manual
Summary of Contents for ThinkServer TD200
Page 2: ......
Page 8: ...viii ThinkServer TD200 Hardware Maintenance Manual ...
Page 28: ...20 ThinkServer TD200 Hardware Maintenance Manual ...
Page 138: ...130 ThinkServer TD200 Hardware Maintenance Manual ...
Page 264: ...256 ThinkServer TD200 Hardware Maintenance Manual ...
Page 300: ...292 ThinkServer TD200 Hardware Maintenance Manual ...
Page 327: ...Lenovo product service Appendix A Getting help and technical assistance 319 ...
Page 328: ...320 ThinkServer TD200 Hardware Maintenance Manual ...
Page 338: ...330 ThinkServer TD200 Hardware Maintenance Manual ...
Page 344: ...336 ThinkServer TD200 Hardware Maintenance Manual ...
Page 345: ......
Page 346: ...Part Number Printed in USA 1P P N ...