Figure 38. Installing the air baffle
Step 3. Proceed to install the risers with full-length PCIe adapters (see
“Install full-length adapters and riser
assemblies (360mm chassis)” on page 114
).
After this task is completed
1. Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 174
).
CMOS battery (CR2032) replacement
See these topics to learn how to remove and install the CMOS batteries.
Remove the CMOS batteries (CR2032)
See this topic to learn how to remove the CMOS batteries.
About this task
To avoid potential danger, make sure to read the following safety information.
S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
S004
58
ThinkEdge SE450 Maintenance Manual
Summary of Contents for 7D8T
Page 1: ...ThinkEdge SE450 Maintenance Manual Machine Types 7D8T ...
Page 8: ...vi ThinkEdge SE450 Maintenance Manual ...
Page 22: ...14 ThinkEdge SE450 Maintenance Manual ...
Page 45: ...Server components Figure 17 Server components Chapter 2 Server components 37 ...
Page 184: ...176 ThinkEdge SE450 Maintenance Manual ...
Page 206: ...198 ThinkEdge SE450 Maintenance Manual ...
Page 210: ...202 ThinkEdge SE450 Maintenance Manual ...
Page 217: ......
Page 218: ......