background image

Page 7

Switch 5 -- Cooling Blower-Off Delay -- 

The cooling

blower-off delay (time that the blower operates after the

cooling demand has been satisfied) can be adjusted by

moving switch 5 on the integrated control. The switch is fac­

tory-set in the OFF position, which provides a cooling blow­

er-off delay of 45 seconds. If the switch is toggled to the ON

position, it will provide a 2-second cooling blower-off delay

On-Board Link W951 Heat Pump (R to O)

On-board link W951 is a clippable connection between ter­

minals R and O on the integrated control. W951 must be cut
when the furnace is installed in applications which include a
heat pump unit and a thermostat which features dual fuel
use. If the link is left intact, terminal “O” will remain ener­
gized eliminating the HEAT MODE in the heat pump.

On-Board Link W915 2 Stage Compr (Y1 to Y2)

On-board link W915 is a clippable connection between ter­
minals Y1 and Y2 on the integrated control. W915 must be
cut if two-stage cooling will be used. If the Y1 to Y2 link is
not cut the outdoor unit will operate in second-stage cool­
ing only.

TWO-STAGE INTEGRATED

CONTROL

THERMOSTAT CONNECTIONS (TB1)

1/4” QUICK CONNECT TERMINALS

DIP SWITCH FUNCTIONS

DIP

SWITCHES

DIAGNOSTIC

LEDs

ON-BOARD

LINKS

1=  ERROR CODE RECALL
H= 24V HUMIDIFIER OUTPUT
L= LENNOX SYSTEM OPERATION MONITOR

SENSE = 120 VAC OUTPUT TO FLAME SENSOR
NEUTRALS= 120 VAC NEUTRAL
PARK = DEAD TERMINAL FOR UNUSED BLOWER LEAD
HEAT LOW = 120 VAC OUTPUT TO CIRC BLWR -- LOW HT SPEED &  CONT
FAN
HEAT HIGH/ COOL LOW = 120 VAC OUTPUT TO CIRC BLWR -- 

HIGH HEAT AND LOW COOL SPEED

COOL HIGH = 120 VAC OUTPUT TO CIRC BLWR -- HIGH COOL SPEED

DIP SWITCH(ES)

FUNCTION

1 -- 2 Stage T'stat

Selects t/stat type (single or two-stage)

2 -- 2nd Stage Delay

Second stage ON delay (single-stage t'stat)

3 & 4 -- Heat Off Delay

Heating fan OFF delay

5 -- Cool Off Delay

Cooling fan OFF delay

W915

W951

FIGURE 5

TABLE 2

SureLight control 5 Pin Terminal Designation

PIN #

Function

1

Ignitor

2

Combustion Air Inducer High Speed

3

Combustion Air Inducer Low Speed

4

Combustion Air Inducer Neutral

5

Ignitor Neutral

TABLE 3

SureLight control 12Pin Terminal Designation

PIN #

Function

1

Gas Valve High Fire

2

Second Stage pressure Switch

3

Rollout In

4

Ground

5

24V Hot

6

Primary Limit In

7

Gas Valve Low Stage

8

Gas Valve Common

9

24V Neutral

10

Ground

11

Rollout Switch Out

12

1st Stage pressure Switch

Summary of Contents for EL280DF SERIES

Page 1: ...nual except where noted are recommendations only and do not consti tute code TABLE OF CONTENTS Specifications Page 2 Blower Performance Data Page 3 Parts Identification Page 4 I Unit Components Page 5...

Page 2: ...2 x 10 Motor output hp 1 3 1 2 1 Tons of add on cooling 2 3 5 3 4 4 5 Air Volume Range cfm 717 1562 917 1929 1517 2760 Electrical Data Voltage 120 volts 60 hertz 1 phase Blower motor full load amps 6...

Page 3: ...1585 572 1332 489 0 20 1864 717 1745 623 1544 540 1321 463 0 30 1779 683 1676 588 1496 510 1296 440 0 40 1694 647 1600 558 1443 473 1265 417 0 50 1596 607 1502 511 1363 440 1212 393 0 60 1483 577 141...

Page 4: ...ION Control Box includes integrated control transformer and door switch Secondary Limit Internal Flue Pipe Assembly Gas Val ve Burner Box Assembly Combustion Air Inducer Indoor Blower Heat Exchanger P...

Page 5: ...pted 4 SureLight Integrated Control A92 EL280DF units are equipped with the Lennox two stage in tegrated SureLight control The system consists of a igni tion blower control figures 5 and 6 with contro...

Page 6: ...eration flow charts in the back of this manual for more detail DIP Switch Settings Switch 1 Thermostat Selection This unit may be used with either a single stage or two stage thermostat The thermostat...

Page 7: ...ool ing only TWO STAGE INTEGRATED CONTROL THERMOSTAT CONNECTIONS TB1 1 4 QUICK CONNECT TERMINALS DIP SWITCH FUNCTIONS DIP SWITCHES DIAGNOSTIC LEDs ON BOARD LINKS 1 ERROR CODE RECALL H 24V HUMIDIFIER O...

Page 8: ...Page 8 INTEGRATED CONTROL FIGURE 6...

Page 9: ...5 1 Hard lockout Rollout circuit open or previously opened 5 2 Control failed self check internal error control will restart if error recovers 5 3 No Earth ground control will restart if error recove...

Page 10: ...as Valve The two stage gas valve figure 11 is internally redundant to assure safety shut off If the gas valve must be replaced the same type valve must be used 24VAC terminals and ON OFF switch are lo...

Page 11: ...Page 11 EL280DF HEATING COMPONENTS FIGURE 7 Ignitor Burners Sensor Gas Valve Manifold and Gas Orifices Rollout Switch...

Page 12: ...t damage plug Check voltage during 20 second ignitor warm up period Voltage should read 120 volts or 10 If voltage is above or below these values check for correct supply voltage to furnace Test 1 Che...

Page 13: ...thermostat contacts to cycle system 7 When main burners are in operation for two minutes take reading TABLE 5 Flame Signal in Microamps Normal Low Drop Out 1 9 or greater 1 4 or less 20 FIGURE 9 Measu...

Page 14: ...f the combus tion air inducer is not operating or if the flue becomes ob structed On heat demand first or second stage the switch senses that the combustion air inducer is operating It closes a cir cu...

Page 15: ...ove access panel 4 Turn switch on gas valve to OFF Do not force See fig ure 11 5 Replace access panel Failure To Operate If the unit fails to operate check the following 1 Is the thermostat calling fo...

Page 16: ...on various metals used in gas piping Use of a specialty Gas Leak Detector is strongly recommended It is available through Lennox under part number 31B2001 See Corp 8411 L10 for further details Do not...

Page 17: ...re adjustment or replacement to ensure proper operation at higher altitudes See table 10 for manifold pressures and table 11 for pressure switch kits and gas conversion kits TABLE 10 Manifold Pressure...

Page 18: ...E 13 Return Supply TEMPERATURE RISE Supply Duct Temperature Return Duct Temperature _ Temperature Rise C External Static Pressure 1 Tap locations shown in figure 14 2 Punch a 1 4 diameter hole in supp...

Page 19: ...and unobstructed to provide combustion air 10 Inspect the furnace venting system to make sure it is in place structurally sound and without holes corrosion or blockage Vent system must be free and cl...

Page 20: ...e careful with the collector box gas ket If the gasket is damaged it must be replaced to prevent leakage 6 Disconnect gas supply piping Remove the screw se curing the burner box cover and remove cover...

Page 21: ...bustion air inducer Failure to replace all screws may cause leaks Inspect gaskets for any damage and replace if necessary 15 Reinstall burner box manifold assembly and burner box cover 16 Reconnect al...

Page 22: ...Page 22 VII Wiring and Sequence of Operation EL280DF Schematic Wiring Diagram...

Page 23: ...first stage de mand is satisfied OR a second stage heat demand is initiated 6 Second stage heat demand initiated A 30 second sec ond stage recognition period begins 7 The combustion air inducer ramps...

Page 24: ...DIP Switch 1 W915 Two Stage Cooling W951 Heat Pumps 1 Heat 1 Cool NOTE Use DIP switch 2 to set sec ond stage heat ON delay OFF10 minutes ON 15 minutes ON Intact Intact S1 T STAT CONTROL TERM STRIP OU...

Page 25: ...P Switch Settings and On Board Links See figure 6 Wiring Connections DIP Switch 1 W915 Two Stage Cooling W951 Heat Pumps 2 Heat 2 Cool OFF Cut Intact S1 T STAT CONTROL TERM STRIP OUTDOOR UNIT 2 Heat 1...

Page 26: ...OR T STAT IS CYCLED OFF ON FOR 3 SEC MINIMUM NO YES FIRST LOW STAGE PRESSURE SWITCH CONTACTS OPEN NO GAS VALVE OFF COMBUSTION AIR INDUCER OFF INDOOR BLOWER OFF CONTROL REMAINS UNTIL PRESSURE SWITCH I...

Page 27: ...NDS AFTER GAS VALVE OPENS u0 19 microamps GAS VALVE OFF COMBUSTION AIR INDUCER ON INDOOR BLOWER OFF STATUS LED HEARTBEAT HAS CONTROL FAILED TO SENSE FLAME FOR FIVE CONSECUTIVE TRIES DURING A SINGLE HE...

Page 28: ...ST STAGE HEAT DEMAND SATISFIED GAS VALVE OFF COMBUSTION AIR INDUCER OFF FOLLOWING POST PURGE INDOOR BLOWER OFF WITH DELAY STATUS LED PULSE YES SECOND STAGE HEAT DEMAND SECOND STAGE HEAT DEMAND REQUIRE...

Page 29: ...ODE DIP SWITCH SET AT SINGLE YES YES FIRST AND SECOND STAGE HEAT DEMAND SATISFIED SIMULTANEOUSLY STATUS LED HEARTBEAT YES GAS VALVE OFF COMBUSTION AIR INDUCER OFF AFTER 5 SECOND LOW SPEED POST PURGE P...

Page 30: ...ZED NO IS THERE PROPER GROUND YES NO INDOOR BLOWER ENERGIZED ON FIRST STAGE COOL SPEED AFTER 2 SECOND DELAY FIRST STAGE DEMAND FOR COOL SATISFIED NO THERMOSTAT CALLS FOR SECOND STAGE COOL COMPRESSOR A...

Page 31: ...TO LOW HEAT SPEED FIRST STAGE HEAT DEMAND SATISFIED YES NO THERMOSTAT CALLS FOR SECOND STAGE HEAT YES INDOOR BLOWER SWITCHES TO HIGH HEAT SPEED AFTER 30 SECOND RECOGNITION PERIOD SECOND STAGE HEAT DE...

Reviews: