INSTALLATION ON A ROOF MOUNTING FRAMES
BALTIC R410A-IOM-0708-E
Page 23
Heat Recovery Installation
1) The unit being already erected on the roof curb, position the elbow by plugging the returns (A) in the slits (B) of the
framework of the unit: see detail
2) Fix the elbow with caged nuts at envisaged places (C)
3) Apply mastic on the two side studs and on the superior stud of the energy recovery box.
4) Pose the energy recovery box on the elbow
5) Fix the energy recovery box thanks to the two edges at 45° right and left with self-drilling screws (D)
1
4
Fig. 25
Summary of Contents for BAC020SNM
Page 11: ...COMMISSIONING REPORT BALTIC R410A IOM 0708 E Page 10 ...
Page 66: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 65 ROOF TOP AT15 11S ...
Page 67: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 66 ROOF TOP AT15 15S ...
Page 69: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 68 AT10 10S EXHAUST ROOF CURB ...
Page 70: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 69 EXHAUST ROOF CURB AT10 8G2L ...
Page 71: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 70 EXHAUST ROOF CURB AT10 10G2L ...
Page 126: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 125 ...
Page 127: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 126 ...
Page 128: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 127 ...
Page 129: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 128 ...
Page 130: ...CERTIFICATES G4 FILTERS BALTIC R410A IOM 0708 E Page 129 ...
Page 131: ...CERTIFICATES F7 FILTERS BALTIC R410A IOM 0708 E Page 130 ...
Page 132: ...CERTIFICATES CLIMAVER 202 BALTIC R410A IOM 0708 E Page 131 ...
Page 133: ...CERTIFICATES CLIMAVER 274 BALTIC R410A IOM 0708 E Page 132 ...
Page 134: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 133 ...
Page 135: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 134 ...
Page 136: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 135 ...