Lennox Hearth Products MONTECITO ESTATE MONTEST Installation And Operating Instructions Manual Download Page 18

ANGLED WALL RADIATION SHIELD
(XRSMI30 and AC10RSMI30)

When traversing a combustible wall with the chimney at a 30º or 45º 
angle, an angled fi restop or wall radiation shield must be installed.  Only 
one is required.

Note: 45º angle for Canada only (XRSMI45).

In cold climate locations (climates where temperatures will fall below 32º 
F / 0º C), we recommend that you use the insulated wall radiation shield 
since it will maintain the home’s thermal barrier.

XRSMI30 and AC10RSMI30 

(XRSMI45 - Canada Only)

Chimney Model (7” dia).

Angle

Hole Size

Secure Temp™

  

S2100+ 

Nova Temp™

  

 

Secure Temp

 

GX

 

(US only)

30º

15” x 38-1/4”

(380 mm x 972 mm)

Secure Temp

 

S2100+ 

Nova Temp

 

 

45º

Canada only

15” x 25-7/8”

(380 mm x 657 mm)

ACBI

30º

17 x 42-1/2”

(432 mm x 1080 mm)

Table 5

Figure 30

Drywall

Insulated Wall

Insulated Wall
Radiation Shield

CHIMNEY SUPPORT INSTALLATION

Universal Roof Support

This support has three possible uses:

1.  For Secure Temp S2100+ / Nova Temp

 

/ Secure Temp

 

GX, it 

must be used on a roof to support the chimney.

2. It may be used on a fl oor, ceiling or roof above an offset to support 

the chimney above the offset.

3.  It may be used on a fl oor, ceiling or roof as a supplementary support 

when the chimney height exceeds 15 feet (4.6 m).

Table 6 

 gives maximum height of supported chimney.

NOTE:

  For the ACBI chimney, a support section (ACBI7SL) must be used 

every 30 feet (9m) or an universal support  every 20 feet (6m) instead of 
the universal roof support (ST).

CHIMNEY

MAXIMUM HEIGHT OF 

SUPPORTED CHIMNEY

7” Diameter

Offset Support

Roof Support

Secure Temp

 

S2100+ 

Nova Temp

 

 

Secure Temp

 

GX

16 feet (5.49 m).

18 feet (6.1 m).

ACBI

40 feet  (12.19 m).

50 feet (15.20 m).

Table 6

CHIMNEY CHASE AND MULTIPLE TERMINATIONS

For the purpose of this manual, a chimney chase is considered a part of 
the chimney system rather than part of a building.  The termination must 
be placed a minimum of 18” (460 mm) above the chase.

For installations where more than one chimney is located in the same 
chase or within the same area, we suggest that their terminations be 
separated by at least 16” (410 mm) horizontally, and 18” (460 mm) verti-
cally.  This separation is to prevent smoke migrating from one chimney 
to another (see 

Figure 31).

Figure 31

18” (460 mm)

16” (410 mm)

18” (460 mm)

18” (460 mm)

16” (410 mm)

For roof support installation, refer to the instructions provided with the 
support.

Universal Offset Support

This support is used to support the chimney above an offset.  When 
the chimney offset is used to traverse a wall this support may be used 
on the wall to support the chimney.  The maximum heights are given in 

Table 6.

 For offset support installation, refer to the instructions provided 

with the support. 

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

18

Summary of Contents for MONTECITO ESTATE MONTEST

Page 1: ...e la demande Num ro de la pi ce 850 038CF INSTALLATION AND OPERATING INSTRUCTIONS RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Listed to standards ULC S610 UL 127 Report No 304 7213 EPA Cert No 609...

Page 2: ...e left partly opened smoke may be drawn into the room Use optional firescreen when doors are fully opened WARNING Usecarewhenselectingwindow treatments for windows located near the fireplace Avoid usi...

Page 3: ...PARTS REQUIRED Fireplace model MONTEST 7 diameterchimney Model SecureTemp S 2100 Nova Temp HT6000 Secure TempGX U S only or ACBI manufactured by Security Chimneys International only including Chimney...

Page 4: ...burnveryintenselyus ing this method and may damage the firebox Medium Combustion This is the recommended mode of operating the Montecito Estate and should be the one normally used since it will deposi...

Page 5: ...e will be between 6 8 hours and at this combustion rate the level of BTU s is at its lowest Building a Fire A To start a fire place several crumpled up ballsofnewspaperinthefirebox Placesmall dry piec...

Page 6: ...e chimney WARNING When cleaning the fireplace the ashes should be placed in a metal container with a tight fitting lid The closed container of ashes should be placed on a non combustible floor or on t...

Page 7: ...1 400 F If the glass breaks or cracks it must be replaced with an identical ceramic glass Tempered glass or ordinary glass will not withstand the high temperatures of the Montecito Estate Replacement...

Page 8: ...A Frame the fireplace using 2 x 3 or heavier lumber B WARNING Combustible materials cannot be used in the space directly above the fireplace except for the studs above the fa cade that support the fa...

Page 9: ...8 1686 mm Notes Due to Lennox ongoing commitment to quality all specifications ratings and dimensions are subject to change without notice All framing dimensions calculated for 1 2 dry wall at the fi...

Page 10: ...It is located in the bottom of the fireplace towards the back It uses 120V and must be connected to the main electrical circuit byaqualifiedelectrician Forconnection usethe electrical box supplied wit...

Page 11: ...eat A furnace duct is only single wall and not double wall as is required for the Montecito Estate hot air exhaust 7 Use only Security Chimneys International grills and components as described in this...

Page 12: ...above or below floor level Makea4 1 4 110mm holeintheoutsidewallofthehouseatthechosen location From outside place the outside air register in the hole open side down and fasten the register to the wal...

Page 13: ...are located on lower floors in the house such as in a basement in combination with an outside chimney are especially prone to flow reversal 2 The fireplace model MONTEST may be installed only with Se...

Page 14: ...rsal support AC10SU 4 Put the roof flashing in place and seal the joint between the roof and the flashing with roofing pitch see Figures 25 26 For sloping roofs place the flashing under the upper shin...

Page 15: ...ns on Page 14 5 From below install a firestop See Figure 23a 6 A support XST or XSO must be used on the first 15 section 5 m 7 Continue with the regular installation ACBI Chimney 1 Install the first e...

Page 16: ...mm 45 21 32 1160 mm 54 1 8 1375 mm B 17 9 16 446 mm 20 7 16 519 mm 24 5 8 625 mm 28 7 8 733mm 37 3 8 949 mm 42 1067 mm 44 3 4 1137 mm 49 1245 mm 59 9 32 1353 mm 61 3 4 1568 mm Chimney Elbow Offset Hei...

Page 17: ...diation Shield Framing 2 x 3 Figure 29 Roof Support Note In cold areas it is recommended to protect the chimney in a insulated chase Straps Chimney ACBI ACBI Starter Section Straps Outside Wall OFFSET...

Page 18: ...t of supported chimney NOTE For the ACBI chimney a support section ACBI7SL must be used every 30 feet 9m or an universal support every 20 feet 6m instead of the universal roof support ST CHIMNEY MAXIM...

Page 19: ...will enter the masonry chimney 2 In the middle of the oval drill a hole in the masonry chimney at 30 3 Increase the size of the hole until a 30 TUBINOX liner elbow can be easily slipped through 4 Slid...

Page 20: ...ECMC H4855 Outside Air Kit included with fireplace Outside Air Coupler To Connect Outside Air UZI To Fireplace UZIAD UZIAD Outside Air Ducting includes 4 insulated flex x 10 long UZI UZI Gravity Kit G...

Page 21: ...ashing Adjustable 30 45 includes spacer collar ACBI7FBR H3277 Misc Firestop ACBI7BF H3268 Radiation Shield ACBI7RS H3269 Attic Radiation Shield ACBI7RSA H3270 Telescopic Attic Radiation Shield ACBI7RS...

Page 22: ...PR SR2417 Right Side Refractory Bricks Front PR SR2419 Left Side Refractory Bricks Back PR SR2416 Left Side Refractory Bricks Front PR SR2418 Bottom Refractory Brick PR SR2422 Wooden Door Handle PR SR...

Page 23: ...NOTES 23...

Page 24: ...ction which were not manufactured or supplied by LHP or for the labor necessary to install repair or remove such materials parts or construction All replacement or repair components will be shipped F...

Reviews: