6. Display and navigation
6.1. Quick start
This section describes how to validate measurements of the DCBM from the display.
6.1.1. STEP 1 - Power up the DCBM
On powering up the DCBM, the following screens will be displayed successively. In particular, the
following data allow metrological validation:
•
The public key during the boot sequence, for further data authenticity check of LEM format
(i.e. without OCMF RFC5480 header)
•
The global energy registers (import and export), on the idle screen
Detail of data displayed can be found in section "6.3. Boot screens" and "6.4. Idle screen".
Figure 29: Sequence of screens on boot and during idle