Lektron BK 2020 1016 Installation Manual Download Page 1

918.622.4978

www.lektroninc.com

VER. 1.0

BK 2020 1016

LED LIGHTBAND

INSTALLATION GUIDE

9/01/16

CER

TIFIED

SAFETY

US

CA

Summary of Contents for BK 2020 1016

Page 1: ...918 622 4978 www lektroninc com VER 1 0 BK 2020 1016 LEDLIGHTBAND INSTALLATION GUIDE 9 01 16 CERTIFIED SAFETY US CA ...

Page 2: ... parapet band system However always be aware of your surroundings and site conditions that cannot be taken into consideration when writing this guideline It is always yourresponsibility to ensure a safe and clean workplace environment if they are different from what was 1 Review the onsite construction plans supplied withthe parapet band system or if you are missing anycomponents in the system call...

Page 3: ...ycarbonate Lens Continuous Length 12 x 2 Hex Head Screw 10 x 3 4 Hex Head Screw 185 5082 Mounting Bracket 191 5003 Adjustment Bracket 191 5003 Housing Coupling 191 2040 Track Clip 6 x 1 2 Pan Head Screw 191 1136 3 5L RED Board 191 0950 12 20L RED Board 191 7011 Aluminum Housing 8 Length 185 5045 Mounting Bracket 191 5003 Adjustment Bracket I S Corner Housing 191 1026 Corner Cap 12 x 2 Hex Head Scr...

Page 4: ...o 4 mounting brackets 2 Attach corner to brackets with 10 x tek screws 3 Install the rst 8 aluminum xture housing by aligning to the edge of the mounting bracket and approximately from the end of the run Insure that housing is plumb and level shim if required Fasten each with 5 10x Hex Head tek screws spaced approximately 2in apart through the mounting bracket 4 Using four 10 x tek screws screw th...

Page 5: ...alled clips Be careful not to break the LEDs 2 After housing cuts are made and installed LED light boards must t the size of the newly cut housing 3 Install full 1 foot boards until less than 1 foot of space remains 4 Gently adjust LED lights to t the adjusted housing 5 Trim LED light board length at wire connections only Leave the longest wire length possible Angle LED Board Push into groove and ...

Page 6: ...e transformer per 32 boards maximum or less No less than 8 boards per transformer Side by Side mounting location shown below can reduce primary and secondary wiring labor time 3 3 Liquid Tight Connector TO J BOX Black White wires Primary connection only by Electrician Blue and Yellow low voltage wires from transformers Connect to low voltage cable Non Polarized SECURE ELECTRICAL BOX SCREWS PROVIDE...

Page 7: ... IN YELLOW AND BLUE ARE FOR LOW VOLTAGE POWER OUT 1 Using the installed transformers supply power to the LED light chains by connecting a temporary 120v connection to the black and white wires on the transformer to power the LED lights 2 Check to see if all LEDs are lit and working correctly 3 If a board or section does not light up is damaged etc disconnect power and check connections or replace ...

Page 8: ...te The length of lens that will be deducted from your overall length is critical in order to accommodate the expansion and contraction of the lens in varying temperatures 3 After determining the Trim Length subtract that from your overall length for that section Example 45 section will require a trim length of 1 3 4 leaving you with an overall cut length of 44 10 1 4 4 Using the example above cut ...

Page 9: ... red corner cap into the housing and secure between the lens and thelens ashing SILVER END CAP INSTALLATION 1 Place top edge of end cap inside housing lip 2 Attach bottom trim to hold in place SILVER CORNER CAP INSTALLATION NOTE Trim is on the outside of the lens Iso View Inside Corner Inside Corner Cap Iso View Outside Corner Outside Corner Cap NOTE Do not install the corner or end caps until the...

Page 10: ...918 622 4978 www lektroninc com sales lektroninc com ...