201
F(L)CS Data Acquisition
Figure 178:
Loading and saving FCS-specific instrument parameter settings
18.4
Measurements Step – FCS Measurement Time Series at
Multiple Points
After optimizing the FCS measurement conditions, it is possible to have FCS measurements
run automatically at previously defined measuring points with the previously defined
settings. To do so, go to the
Measurements
step.
18.4.1
FCS Network Connection
The LAS AF and SymPhoTime programs are synchronized via a network connection. Each
FCS measurement started in LAS AF in the
Measurements
step of the FCS Wizard generates
a new data file in SymPhoTime. In addition to the synchronization, the network also enables
transmission of relevant information such as the file name, instrument parameter settings
(IPS), or comments entered by the user in LAS AF.
During the FCS measurement, an online correlation curve is displayed that is automatically
saved along with the raw data in SymPhoTime. After the data acquisition, a more detailed
data analysis can then be carried out offline.
Do not change Acquisition mode any more
Do not make any more changes to the
Acquisition mode
used to acquire
the last image.
Observe the SymPhoTime manual
For more detailed information about data analysis, refer to the
SymPhoTime manual.
Summary of Contents for TCS SP8 SMD
Page 1: ...10 Living up to Life User Manual Leica TCS SP8 SMD for FCS FLIM and FLCS ...
Page 4: ...4 Copyright ...
Page 14: ...14 Contents ...
Page 18: ...18 Intended Use ...
Page 20: ...20 Liability and Warranty ...
Page 28: ...28 General Safety Notes ...
Page 32: ...32 Additional Notes on Handling the System ...
Page 44: ...44 System Overview and Properties ...
Page 60: ...60 SMD Components Figure 31 DSN 102 Dual SPAD Power Supply ...
Page 80: ...80 Safety Features ...
Page 102: ...102 Switching On the System ...
Page 116: ...116 LAS AF ...
Page 214: ...214 Changing the Specimen ...
Page 216: ...216 Changing the Objective ...
Page 238: ...238 Switching Off the System ...
Page 242: ...242 Repairs and Service Work ...
Page 244: ...244 Maintenance ...
Page 246: ...246 Disassembly and Transport ...
Page 248: ...248 Disposal ...
Page 254: ...254 Contact ...
Page 256: ...256 Recommended Literature ...
Page 266: ...266 Appendix Figure 225 Declaration of conformity ...
Page 268: ...268 Appendix ...
Page 269: ......