30
Basic Operation
3.2
The LCD Display
f)
When the start-up screens are completed, the Main Oper-
ating Screen will be displayed and work can begin.
a) Line movement indication
b) Plus / minus grade value
c)
Beam emission indicator
d) Battery status indicator
e) Line and grade lock indicator
f)
Percent (per mill)
a
b
c
d
e
f