
254
Understanding Stake and Check Basics
Finished road level
Describes the final road surface.
Catch point
or
daylight point
Indicates the point of intersection between the slope and the
natural surface. Both the hinge point and the catch point lie on
the slope. In the case of a cut slope, the catch point forms part
of the top of a bank (
top
). In the case of a fill slope, the catch
point forms part of the bottom of a bank (
toe
).
Chainage
or
station
The cumulative distance along the centre line, frequently but
not always starting at zero.
Technical term
Description
Summary of Contents for RoadRunner
Page 1: ...Leica RoadRunner Technical Reference Manual Version 5 0 English ...
Page 15: ...Step 1 RoadRunner Begin RoadRunner 15 ...
Page 35: ...Step 3 Working in Standard mode RoadRunner 35 ...
Page 121: ...Step 4 Measuring RoadRunner 121 ...
Page 158: ...158 RoadRunner Configuring Screen ...
Page 164: ...164 RoadRunner Configuring Next step CONT F1 to confirm the changes and continue ...
Page 191: ...Configuring RoadRunner 191 ...
Page 201: ...Managing the Project RoadRunner 201 ...
Page 223: ...Viewing and Editing the Design Data RoadRunner 223 ...
Page 251: ...Working with the Extras Menu RoadRunner 251 ...
Page 335: ...Quick Start Tutorial Advanced Mode RoadRunner 335 ...
Page 340: ...i 340 RoadRunner Index ...
Page 341: ...Index RoadRunner i 341 ...