Page 44
Transport/Start up
Group 5
Release 2.02
JET3 Series
5.4 Start-up Commissioning
For a safe transport some hydraulic components are supplied with transportation protection
(cable ties) and the reservoir tanks are evacuated. The following steps have to be carried
out before the initial operation
Remove the transportation protection (cable ties) (Step 1)
Fill the reservoir tank (Step 2)
Carry out the function <Filling Routine> (Step 3)
5.4.1 Remove transportation safety devices - Step 1
The pumps and valves of the hydraulic system are secured with cable ties. These
have to be
absolutely removed.
Proceeding:
Dismantle the backplane of the hydraulic cabinet
(1)
by loosing the fixing screws
(2)
.
ATTENTION
The cable tie at the main filter (3) should not be removed!
Remove the transportation protection (cable ties).
Now attach the backplane of the hydraulic cabinet again with the according fixing screws.
Summary of Contents for JET3
Page 1: ...Operating Manual V2 02 Please keep for future reference ...
Page 2: ......