Legacy LEGACY24100 User Manual Download Page 3

2

User manual

www.connectinglegacy.com

1. Introduction

The Energy storage pack is an essential component of the photovoltaic power generation system. It can provide

electricity for the connected load, and it can also store photovoltaic solar modules, fuel generators, or wind

energy generators by charging the remaining energy in case of emergency. When the sun goes down, energy

demand is high, or there is a power outage, you can use the energy stored in the system to meet your energy

needs at no additional cost. In addition, the energy storage Pack can help you achieve energy self-consumption

and ultimately achieve the goal of energy independence.

According to different power conditions, the energy storage PACK can output power during peak power

consumption, and can also store energy during low power consumption. Therefore, when connecting the

matching photovoltaic modules or inverter arrays, external equipment is required to match the energy storage

the working parameters of the pack to achieve the highest operating efficiency. For a simple diagram of a typical

energy storage system.

Figure 1 Energy storage System Overview

It is very important and necessary to read the user manual carefully before installing or using the battery.

Failure to follow any of the instructions or warnings in this document can result in electrical shock, serious injury,

death,

or may damage the battery and the whole system.

If the battery is stored for a long time, it is requirement that they are charged every three to six months, and

the SOC should be no less than 80%,after fully discharging,The battery needs to be recharged within 12

hours.

Do not expose cable outside;Do not use cleaning solvents to clean the battery.

All battery terminals must be disconnected before maintenance.

Summary of Contents for LEGACY24100

Page 1: ...USER MANUAL FOR LITHIUM BATTERY ENERGY STORAGE SYSTEM VERSION 1 0 LEGACY24100 150 300 LEGACY48100 150 300 LEGACY51 2 100 150 300...

Page 2: ...on note insert the RS232 port 8 6 2 The communication PIN of battery and the invterter 9 6 3 Dial settings of battery ADS address 9 6 4 How to connect Growatt inverter RS485A 10 6 5 How to connect Gro...

Page 3: ...during low power consumption Therefore when connecting the matching photovoltaic modules or inverter arrays external equipment is required to match the energy storage the working parameters of the pa...

Page 4: ...5 RS232 485 16 Operation Temperature Range Charge 0 55 Discharge 20 55 17 Storage Temperature Range recommend 0 25 18 Combination method 24V 48V 51 2V 19 Rated Capacity Ah Parallel PACK Parallel PACK...

Page 5: ...st first if the battery is damaged or spare parts are missing Please contact the dealer Before installation be sure to cut off the grid power and make sure the battery is in the turned offmode Wiring...

Page 6: ...nguisher can be used liquid fire extinguishers are prohibited Please do not open repair or disassemble the battery We do not undertake any consequences or related responsibility due to violation of sa...

Page 7: ...all this Pack module at eye level in order to allow the readability of LCD display at all times For proper air circulation to dissipate heat please leave a gap of about 0 3 meter from the ground 30 cm...

Page 8: ...of the nut on the cabinet with the mounting bracket and clamp the nut into the cabinet See Figure5 Figure 5 Step 4 As shown in the below install the battery pack The pack is too heavy Please use a spe...

Page 9: ...te insert the RS232 port 6 1 1 Prepare a computer Win7 system or above use a special cable to connect the battery and the PC 6 1 2 Install software Please ask the manufacturer for the installation pac...

Page 10: ...COMMUNICATION PIN OF BATTERY AND THE INVERTER Battery Pack Inverter Pin1 NC Pin1 NC Pin2 NC Pin2 NC Pin3 NC Pin3 NC Pin4 CANH Pin4 CANH Pin5 CANL Pin5 CANL Pin6 NC Pin6 NC Pin7 GND Pin7 GND Pin8 NC Pi...

Page 11: ...ww connectinglegacy com 6 4 HOW TO CONNECT Growatt INVERTER RS485A 6 4 1 THE COMMUNICATION PIN OF BATTERY AND THE INVERTER RS485A ONE SET OF BATTERY TWO SETS OF BATTERIES THREE SETS OF BATTERIES 15 SE...

Page 12: ...om 6 4 2 RS485 COMMUNICATION SETTING OF THE INVERTER 1 LCD SETTING AS BELOW 2 CLICK ON ENTER AND DOWN UP TO SELECT 05 AND LI LITHIUM MODE 3 CLICK ON ENTER AND DOWN UP TO SELECT 36 AND L04 4 CLICK ON E...

Page 13: ...ww connectinglegacy com 6 5 HOW TO CONNECT Growatt INVERTER Canbus 6 5 1 THE COMMUNICATION PIN OF BATTERY AND THE INVERTER Canbus ONE SET OF BATTERY TWO SETS OF BATTERIES THREE SETS OF BATTERIES 15 SE...

Page 14: ...om 6 5 2 RS485 COMMUNICATION SETTING OF THE INVERTER 1 LCD SETTING AS BELOW 2 CLICK ON ENTER AND DOWN UP TO SELECT 05 AND LI LITHIUM MODE 3 CLICK ON ENTER AND DOWN UP TO SELECT 36 AND L52 4 CLICK ON E...

Page 15: ...ual www connectinglegacy com 6 6 HOW TO CONNECT DEYE INVERTER 6 6 1 THE COMMUNICATION PIN OF BATTERY AND THE INVERTER Canbus ONE SET OF BATTERY TWO SETS OF BATTERIES THREE SETS OF BATTERIES 15 SETS OF...

Page 16: ...nglegacy com 6 6 2 THE COMMUNICATION SETTING OF THE INVERTER 1 CLICK ON SETTING ON THE LCD 2 CLICK ON BATTERY SETTING SELECT LITHIUM AS BATTERY MODE 3 AFTER LITHIUM MODE SUCCESSFULLY CONNECTED BMS WIL...

Page 17: ...ay rendering 2 Main menu page After BMS is activated will show the welcome screen press the MENU button to enter the main menu page As shown in the figure below 3 Battery parameters page When the curs...

Page 18: ...of ensuring safety non operating personnel immediately move to a safe location B Under the condition of ensuring safety the operator immediately cut off the external power supply of the equipment and...

Page 19: ...is product please contact us The shelf life of this product is within 36 months after it is delivered we will maintain the product which is in the warranty period for free of charge provided that it h...

Page 20: ...19 User manual www connectinglegacy com...

Reviews: