3-4
Leeboy Model 8510E Conveyor Paver
Component Location
Augers
Right and left augers rotate
to move material from the
conveyors to the screed.
The auger can be manually
controlled at the operator
platform or by a screed
operator on the screed.
The auger can also be controlled automatically when
the optional auger/conveyor sonic sensor system is
installed and active. The sensor is mounted on the
screed endgates and used to monitor and control
the pile height of material at the discharge end of the
augers.
Torque Hubs
The paver drive system contains two torque hubs that
provide power to propel the tracks.
Standard Equipment/Options
Component
8 - 15 feet (2.44 - 4.57 m) Propane Screed
v
Electronic Gauge Package
v
Two-Speed Hydrostatic Drive
v
Under Auger Cut-Off Gates
v
Light and Safety Beacon Package
v
12-inch (30.5 cm) Augers w/Sonic Control
v
Citrus Tank
v
Anti-Vandalism Package
v
Legend Electric Screed
Option
Legend 815HD Electric Screed
Option
Dual Grade Control
Option
Dual Grade and Slope Control
Option
Truck Hitch
Option
Steering Wheel
Option
Roll-Up Curb Attachment
Option
Heated End Gates
Option
Hopper and Conveyors
The hopper wings are hydraulically raised and lowered
to open and close the hopper. When fully open, the
hopper can hold a payload up to 7.5 tons.
Material in the hopper is moved toward the back of the
paver to the screed by conveyors. The conveyor is
activated at the operator platform. Its wide, automatic
conveyors with a wide hopper design delivers asphalt
more evenly and efficiently to produce a smooth asphalt
mat.
The hopper’s conveyor bed can be lifted hydraulically,
allowing easy access to the paver undercarriage and
tracks for service and cleaning.
Screed
The screed is the last part of the paver that contacts the
paving material. A screed operator usually operates
the screed while the operator drives the machine.
Paving material is fed from the hopper and conveyor
to the augers to the front of the screed. The screed
has hydraulically-controlled extensions that move in
and out to allow a paving base from 8 - 15 feet. Screed
heating is accomplished by propane or the optional
electric heating elements mounted directly to the wear
plates. The electric vibrators mounted on the main
screed frame can be used to increase paving material
compaction.
Summary of Contents for 8510E
Page 2: ......
Page 14: ...NOTES xiv LeeBoy Model 8510E Conveyor Paver...
Page 16: ...NOTES Safety LeeBoy 8510E Conveyor Paver 1 2...
Page 26: ...NOTES Safety LeeBoy 8510E Conveyor Paver 1 12...
Page 40: ...NOTES Leeboy Model 8510E Conveyor Paver 3 2 Component Location...
Page 52: ...3 14 Leeboy Model 8510E Conveyor Paver Component Location NOTES...
Page 144: ...Maintenance LeeBoy 8510D Conveyor Paver 5 54 NOTES...
Page 148: ...LeeBoy 8510E Conveyor Paver 6 4 Schematics NOTES...
Page 150: ...LeeBoy 8510E Conveyor Paver 6 6 Schematics NOTES...
Page 152: ...LeeBoy 8510E Conveyor Paver 6 8 Schematics NOTES...
Page 154: ...LeeBoy 8510E Conveyor Paver 6 10 Schematics NOTES...
Page 156: ...LeeBoy 8510E Conveyor Paver 6 12 Schematics NOTES...
Page 158: ...LeeBoy 8510E Conveyor Paver 6 14 Schematics NOTES...
Page 160: ...LeeBoy 8510E Conveyor Paver 6 16 Schematics NOTES...
Page 162: ...LeeBoy 8510E Conveyor Paver 6 18 Schematics NOTES...
Page 164: ...LeeBoy 8510E Conveyor Paver 6 20 Schematics NOTES...
Page 166: ...LeeBoy 8510E Conveyor Paver 6 22 Schematics NOTES...
Page 168: ...LeeBoy 8510E Conveyor Paver 6 24 Schematics NOTES...
Page 170: ...LeeBoy 8510E Conveyor Paver 6 26 Schematics NOTES...
Page 172: ...LeeBoy 8510E Conveyor Paver 6 28 Schematics NOTES...
Page 174: ...LeeBoy 8510E Conveyor Paver 6 30 Schematics NOTES...
Page 176: ...LeeBoy 8510E Conveyor Paver 6 32 Schematics NOTES...
Page 178: ...LeeBoy 8510E Conveyor Paver 6 34 Schematics NOTES...
Page 180: ...LeeBoy 8510E Conveyor Paver 6 36 Schematics NOTES...
Page 182: ...LeeBoy 8510E Conveyor Paver 6 38 Schematics NOTES...
Page 184: ...LeeBoy 8510E Conveyor Paver 6 40 Schematics NOTES...
Page 186: ...LeeBoy 8510E Conveyor Paver 6 42 Schematics NOTES...
Page 188: ...LeeBoy 8510E Conveyor Paver 6 44 Schematics NOTES...
Page 190: ...LeeBoy 8510E Conveyor Paver 6 46 Schematics NOTES...
Page 192: ...LeeBoy 8510E Conveyor Paver 6 48 Schematics NOTES...
Page 194: ...LeeBoy 8510E Conveyor Paver 6 50 Schematics NOTES...
Page 196: ...LeeBoy 8510E Conveyor Paver 6 52 Schematics NOTES...
Page 198: ...LeeBoy 8510E Conveyor Paver 6 54 Schematics NOTES...
Page 200: ...LeeBoy 8510E Conveyor Paver 6 56 Schematics NOTES...
Page 202: ...LeeBoy 8510E Conveyor Paver 6 58 Schematics NOTES...
Page 204: ...LeeBoy 8510E Conveyor Paver 6 60 Schematics NOTES...
Page 206: ...LeeBoy 8510E Conveyor Paver 6 62 Schematics NOTES...
Page 210: ...Illustrated Parts List LeeBoy 8510E Conveyor Paver 7 4...
Page 391: ...NOTES 7 Illustrated Parts List LeeBoy 8510E Conveyor Paver 7 185...
Page 443: ......