Ledon Tube Slides Assembly Instruction Manual Download Page 1

1

Ledon Tube Slides

Assembly instruction

Summary of Contents for Tube Slides

Page 1: ...1 Ledon Tube Slides Assembly instruction ...

Page 2: ...ion about LEDON tubes 7 Installation of the first tube 9 Installation of tubes 10 Installation of tubes with windows 11 Installation of tubes finishing 12 Exit chute 13 Exit chute installation of anchoring 16 Exit chute installation of concrete bracket 18 Trenching of the ground anchor 19 Finish 21 Contents ...

Page 3: ...s established at the very end when attaching the label from the producer Tips Slides with a starting height below 2 meters can be mounted on the ground and then lifted up Slides with a start height over 2 meters can be mounted in sections on the ground We try to make our assembly instructions as useful as possible Do you have any advice or tips for us we hope to hear from you Please write to info ...

Page 4: ... colorful LEDON tunnel slide below Each tunnel is unique and must be assembled according to the LEDON Tunnel Maker installation instructions If a support post is necessary see separate assembly instructions for this Always remember to follow the LEDON assembly instructions Installation example ...

Page 5: ...guide A A 35 cm 12 12 38 A A 35 cm A A 106 cm 17 12 45 9 12 45 14 12 32 6 12 45 13 12 38 8 12 38 12 12 32 10 5 32 A A 35 cm A A 59 cm 24 24 38 A End Start A Tunnel Maker assembly instruction from LEDON is useful when setting up the tunnel slide In the following example we will show you how Example of aTunnel Maker assembly instruction Tunnel Maker assembly instructions ...

Page 6: ...6 Starting All tube assembly starts with the startpanel Attach fiber and bolts as shown below Startpanel ...

Page 7: ... marked with the letter A at each end of the tube This letter refers to the Tunnel Maker mounting instruction supplied by LEDON The A should always be in the top of the tube Example of assembly instructions Useful information about LEDON tubes ...

Page 8: ... 10 9 8 7 6 5 4 3 2 1 Useful information about LEDON tubes Curved tubes All curved tubes are numbered 1 24 next to each flange hole These numbers refer to the Tunnel Maker mounting instruction supplied by LEDON see below Example of assembly instructions ...

Page 9: ...9 A Apply the first tube so that A is in the top of the tube Installation of the first tube ...

Page 10: ...10 The tubes are installed in the sequence and aligning numbers with letters as shown in the LEDON Tunnel Maker assembly instructions Installation of tubes ...

Page 11: ...11 When LEDON s assembly instructions are followed it is ensured that the windows are not on the sliding surface Windows must sit on at 10 and 2 o clock position Installation of tubes with windows ...

Page 12: ...12 Installation of tubes finishing Important Install the second last tube and the exit chute together in a section before it is applied on the tube slide ...

Page 13: ...l the second last tube and exit chute together in a section before it is loaded onto the slide Exit chute 5 pcs 10x25 mm MB Installed in the bushes Bolts must not be overtightened 11 pcs 10 x 40 mm MB 11 x 10 5 x 30 mm SEK ...

Page 14: ...14 5 pcs 10x25 mm MB Installed in the bushes Bolts must not be overtightened Apply the second last tube so that 24 is in the top of the tube As in this example Exit chute ...

Page 15: ...15 Install the other bolts Exit chute 11 pcs 10x45 mm MB ...

Page 16: ...16 10 x 35 mm BB Installation of anchoring for trenching For mounting on concrete see page 18 Exit chute instalation of anchoring ...

Page 17: ...7 For the stability of the anchoring and the exit chute a PE plate must be mounted INSIDE the exit chute and fastened with metal bracket by 3 screws See picture below Exit chute installation of anchoring ...

Page 18: ...18 1 2 3 Exit chute installation of concrete bracket Installation of anchoring for concrete ...

Page 19: ...19 50 cm Trenching of the ground anchor Dig out for the ground anchor only when the tunnel slide is fully assembled and standing on the ground not before See drawing below ...

Page 20: ...20 1 2 3 4 NB Trenching of the ground anchor ...

Page 21: ...21 Finished ...