background image

COMPACT 24” 

8 SHAFTS 

1022-0001

 

1573 Savoie 

C. P. 4 

Plessisville, Qc.   Canada 

G6L 2Y6 

 

TEL: 819-362-7207 

FAX: 819-362-2045 

 

www.leclerclooms.com

[email protected] 

 

 

On receiving the  loom, unpack and 

lay out the loom components.  

Do NOT discard any packing material until 

all parts are inventoried. 

 

  

Check the parts received against the 

parts list on pages #2 to #6 of the assembly 

instructions. Report any discrepancies to 

Leclerc immediately.  

To assemble this loom, a minimum of 2 

people are  needed but  it is recommended 

you use 3. 

Loom Prepared by:_____________

Inspected by:_________________

Date:____________________

...compact /compact8s.indd

(2019)

Summary of Contents for 1022-0001

Page 1: ...ts Do NOT discard any packing material until all parts are inventoried Check the parts received against the parts list on pages 2 to 6 of the assembly instructions Report any discrepancies to Leclerc...

Page 2: ...Octagonal 5x12 treadle cords 9 with washers 1 8 x 3 16 1 5 yard cord 2 10 yard cords 1 boat shuttle 6122 1000 1 adjustable wrench Note for Leclerc in French Enfiler les rondelles 3 16 dans chaque cord...

Page 3: ...metal NEW friction brake system Do not remove the tape over the S hooks 1 right hand side front post with brake cable 44 1 left hand side front post 44 1 right hand side rear post 44 1 left hand side...

Page 4: ...ion handle with 12 loop cord 1 eyesrew 1 left hand side cloth beam support 1 right hand side cloth beam support with ratchet pawl 10 5 wood treadle blocks 4 side post iron fittings Treadle springs 10...

Page 5: ...5 2 batten swords 27 10 treadles 20 1 brake treadle 20 1 treadle rod 5 16 x 30 1 batten handtree 29 1 batten sley 27 1 breast beam 31...

Page 6: ...rew 11 X 14 x 2 50mm 8 X 14 x 1 40mm 4 X 12 x 20mm 10 X 12 x 20mm 1 loop cords 24 for the brake treadle 1 DVD Instruction Video showing all stages of installation 1 book Warp Weave 1x push nuts 5 16 f...

Page 7: ...e leg Screw them in using the 3 4 20mm round headed screw No 12 Do not over tigten so the iron can move freely The screw must be inserted into the smallest hole of the iron fitting Screw No 12 3 4 20m...

Page 8: ...until it is even with the leg B Cross the legs so that the lower end of the leg B is towards the back and the lower end of the leg A is towards the front Add a steel washer and screw a 5 16 8mm lock...

Page 9: ...dle G and the right support H into the right side of the cloth beam Push all these parts between the sides of the loom and fix each support with two 1 40mm round headed screws No 14 Bumpers Bumpers D...

Page 10: ...cer A is in place Install first the rear leg iron fitting D and then the front leg iron fitting fig 5 Screw back the handle into the lower position Place the loom on its left side and install the righ...

Page 11: ...Leave 2 5 8 of rod free at the left side B S S1 BT Affix the push nut after the brake treadle Make sure to leave 4 free in the treadle rod 7 8 2 2 mm free 2 5 8 6 5 mm free Affix the treadle crossmemb...

Page 12: ...is cord into the second loop of the other end Pull so that it makes a knot Brake treadle Machine bolt 5 16 x 3 8mm x 75mm Install the warp beam A between the two 2 back posts Screw a 5 16 x 3 8mm x 75...

Page 13: ...ack tape over the S hooks Place the back beam next to the brake circle Start passing over the brake drum the brake circle Start with the inside of the loom row like in this picture Pass the second row...

Page 14: ...kwise while standing at the right side of the loom near the brake system and this is the warping rotation However you should always release or reduce the ten sion on the brake circle by adjusting the...

Page 15: ...crews No 14 1 Install the lower cross member B 30 in back of the loom with round headed screws No 14 2 For installation with the wheels use 2 flat headed screw 14 x 3 Screw 1 40mm No 14 Screw 2 50mm N...

Page 16: ...must move freely Fix the batten sley B with two 2 50mm round headed screws No 14 Fix the batten handtree C with two 1 4 x 2 3 4 6mm x 70mm carriage bolts two steel washers 1 4 and two wing nuts 1 4 Fi...

Page 17: ...the reed A between the batten handtree B and the batten sley C and lower the batten handtree Tighten the wing nuts Using a hammer insert a batten stopper D round piece of wood into each of the two 2...

Page 18: ...eam A with two round headed screws 1 40mm No 14 Make sure that the hole for the eyescrew is on the right side more instruction on next page Screw 1 40mm No 14 Front Post Hole for the take up motion ha...

Page 19: ...19 Screw the eyescrew in to the pre drilled hole of the breast beam Adjust the height of the take up motion handle by changing the length of the loom cord...

Page 20: ...own Lam Washer and knot Treadle cord with washer Following each tie up close the gate at the end of each treadle Note that if the gate on a treadle is hard to open close it may be necessary to slide t...

Page 21: ...board to install the springs Make a loop cord knot so the length of the spring with the loop cord will hold the weight of the treadle Slide the loop cord end knot under each treadle It is preferable t...

Page 22: ...beam stick 10 Yards Nylon Cord Fig 18 Warp Beam Beam Stick Continue threading the cord through the warp beam and the beam stick Knot the cord at each end of the beam stick Adjust the cord so that the...

Page 23: ...bottom nut as it is Then pull up the shaft frame from the castle We strongly recommend that you have those nuts installed at all times Top Nut Bottom Nut Jack Pin Fig 21 TO INSTALL HEDDLES Disconnect...

Page 24: ...easing the brake system at cloth take up This friction system is adjustable and have to be released when winding the warp on Just screw the wing nut with nylon bolt in the pre install metal indert of...

Page 25: ...with fabric on it IMPORTANT NOTE Be careful when closing and opening the loom To avoid damage and injuries NEVER completely remove the plastic handle MAINTENANCE In order to get the maximum efficency...

Reviews:

Related manuals for 1022-0001