leadsun AE3C User Manual Download Page 1

Made in China

Solar Street Light

User Manual

AE3C

A3C.045-B

Thank you for choosing LEADSUN's solar street light.

If you have any question, please consult our customer services 
[email protected].

LEADSUN

 reserves the right to update product appearance, function 

and construction without notice.

For any discrepancies in illustration or description, please refer to 
individual/real objects. 

LEADSUN assures the accuracy and reliability of this manual, but is 
not responsible for any loss or damage related to any operation of the 
products.

Troubleshooting

No

.

Symptoms

Troubleshooting steps

Process 

1

No light at night

Check that the lamp can be manually 
activated.

Refer to “Activation and Installation” section 
on this user guide and run activation tests.

Check if the solar panel is blocked 
from the sunlight by houses, trees and 
other obstacles.

Clear obstructions or change installation 
location.

Check if there is any artificial light 
source(s) shining on the solar panel 
during the night.

Remove the artificial light source(s) of 
interference or change the installation 
location.

Examine status of each component 
based on the repair guide.

Replace the damaged component(s).

2

A serious shortage 
of working time

Check if the solar panel is blocked 
from the sunlight by houses, trees and 
other obstacles.

Clear obstructions or change installation 
location.

Check if the surface of the solar panel 
is dusty or covered.

Clean the surface of solar panels as 
detailed above.

Examine if the battery pack is 
damaged as per the repair guide 
instructions.

Replace damaged battery.

3

Lighting does not 
follow the normal 
operating mode of 
turning on and off

Check if the working mode setting 

correct

Contact the dealer/supplier

4

Lights fail to turn 
on properly when 
humans approach

Check if the air temperature close to 
human body temperature.

When the air temperature is close to human 
temperature, motion detection may slow 
down. It will return to normal after the air 
temperature changes.

Check if the installation height is too 
high. 

It is out of motion detection range when 
installation height exceeds 8m. It is 
recommended to reduce the height or use 
other operating modes.

Replace damaged motion sensor or 
controllers.

www.leadsunglobal.com

Address:

 1920 S. Archibald Ave. 

Suite I, Ontario, CA 91761

Phone:

 909.476.0900

Fax:

 909.466.0130

Email:

 [email protected]

LEADSUN Australia PTY LTD

LEADSUN Global Limited

LEADSUN INC.

Address:

  42 Greens Road, 

Dandenong South, Victoria 3175

Phone:

 +61 1300 281 005 

Fax:

 +61 3 8610 0393 

Email:

 

 

[email protected]

Address: 

No.1 Workshop, No.15, Pingbei 

2nd Road, Nanping, Zhuhai City, 
Guangdong Province, P.R. China, 
China 519060.

Phone:

 +86-756-2289712

Fax:

 +86-756-8682090

Email:

 sales@leadsunglobal

.

com

Summary of Contents for AE3C

Page 1: ...sunlight by houses trees and other obstacles Clear obstructions or change installation location Check if the surface of the solar panel is dusty or covered Clean the surface of solar panels as detaile...

Page 2: ...e sure the electric supply power is cut off during the installation and implement waterproof and insulation protection Please read the below cautions carefully before using the AE series solar street...

Page 3: ...nting bracket Fix AE3C unit 10 Street light bracket Use to fasten the LED street light 11 Reset button Restart the gateway 12 SIM card slot Insert 2G 4G card 13 Gateway indicator light Red gateway wor...

Page 4: ...to the OFF mode for transport packing or maintenance status OFF mode The system will not work charge or discharge Turn ON the light a Connect the street light to solar engine in daytime it will be ac...

Page 5: ...e LED street light and the cantilever should be no wider than 60mm diameter The diameter of the light pole top which is used to install the solar power supply system should no more than 75mm Cantileve...

Page 6: ...ashers to fix the bird spike along the rim of the screw top of the light See Picture 3 Picture 3 1 Install the bird spike 2 Drill holes on the pole and Install the bracket 88 10 75 1 25 610 Picture 4...

Page 7: ...with the waterproof plug Connect the antenna to the corresponding positions according to the picture below Antenna installation 1 2 Ensure the SIM card cutting edge is face down and the magnetic stri...

Page 8: ...e isolated from other goods when stored so as to avoid any damage The solar panels of this product should be considered as fragile There should never be more than 4 layers of boxes when stacked To avo...

Reviews: