![Leading Edge GA-LETU-016 Installation & Operation Manual Download Page 16](http://html1.mh-extra.com/html/leading-edge/ga-letu-016/ga-letu-016_installation-and-operation-manual_1864824016.webp)
Tel: +44 (0)845 652 0396
Skyrrid Farm, Pontrilas, Hereford. HR2 0BW. UK
www.leturbines.com
Page 16 of 47
Fig-13: Typical ‘Marine’ system wiring diagram (Tristar disconnects when the stop switch is
activated – useful when the LE-450 turbine & Tristar controller are to be used in conjunction with
shore power and engine alternator power sources).
+
-
-
+
-
+
-
+
A
LE-450
TURBINE
(PN: GA-LETU-016)
RUN / STOP
SWITCH BOX
(REQUIRED)
PN: GA-CTRL-008A
AMMETER
(OPTIONAL)
FUSE OR BREAKER
(RECOMMENDED)
BATTERY DISCONNECT
(OPTIONAL)
BATTERY BANK
(WIRED TO APPROPRIATE
CAPACITY & VOLTAGE)
TOWER
OR
SUPPORT
STRUCTURE
SEE RUN / STOP SWITCH
USER MANUAL FOR
DETAILED INSTRUCTIONS
EARTH GROUND
CHASSIS GROUND
CHASSIS GROUND
TRISTAR DIVERSION
CONTROLLER
(REQUIRED)
DUMP LOAD
Summary of Contents for GA-LETU-016
Page 47: ......