![LDC EQUIPMENT LDC ABC Installation And Instruction Manual Download Page 5](http://html.mh-extra.com/html/ldc-equipment/ldc-abc/ldc-abc_installation-and-instruction-manual_1863843005.webp)
Arrow Board Operators Manual V1.2
Page 5 of 12
Sign Positioning
The sign must be positioned on reasonably flat, stable ground in a safe position clear of
obstructions, traffic and pedestrians.
Before removing the trailer from the tow hitch of the tow vehicle, the stabilising legs of
the trailer should be deployed to prevent the possibility of the trailer rolling once
unhitched.
Deploy the stabilising legs from their travelling position (horizontal) to their set up
position (vertical) by pulling out the spring loaded leg locking pin, and pivoting the leg 90
degrees until the locking pin re-locks the leg in position.
Wind the leg down until a firm footing is made with the ground.
Note! - All 4 legs MUST be deployed BEFORE raising the mast!
Inside the Control Box
Note: Solar panels should be cleaned weekly
(more often depending on environmental factors).
Solar Regulator
Sealed Battery
AC4S Controller
ON / OFF
Raise/Lower
Mast
Toggle Switch
Hydraulic Mast
Pump